SolarBattery storageOperatingNEVP

Yellow Pine Solar

Solar and battery storage project in Clark County, Nevada. 190 MW of nameplate capacity across 2 generators, operated by Yellow Pine Solar, LLC.

Also known as EIA plant 66357

This project groups Yellow Pine Solar (EIA 66357). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

MDU / NVSS-IIGoodsprings Waste Heat RecoveryIKEA Las Vegas 462Yellow Pine Solar25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
190 MWSolar 125.0 · Battery storage 65.0
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2023First generator online
Operator
Yellow Pine Solar, LLCEIA operator ID 65453
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.0663, −115.7751
EIA plant ID
66357EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Yellow Pine Solar produces

Free · EIA-923

Net generation, 2025

376 GWh

376,251 MWh, final

Capacity factor, 2025

35.4%

2024: 35.8%

January to July 2026

232 GWh

Provisional

Range, 2024 to 2025

376.3–381.0

GWh a year. Low 2025, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023178,872Not reported6 of 12
2024381,01735.8%12 of 12
2025376,25135.4%12 of 12
2026 (provisional, partial year)231,59637.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
YPESBatteries65.0July 2023
YPS1Solar Photovoltaic125.0July 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Yellow Pine Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Yellow Pine Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Yellow Pine Solar

Questions about Yellow Pine Solar

How much power does Yellow Pine Solar produce?

Yellow Pine Solar reported 376,251 MWh (376 GWh) of net generation in 2025, a 35.4% capacity factor on 190 MW of nameplate capacity. From January to July 2026 it reported 232 GWh, which is provisional.

Where is Yellow Pine Solar?

Yellow Pine Solar is in Clark County, Nevada, at 36.0663, −115.7751. It is in the Nevada Power Company balancing area (NEVP).

Who operates Yellow Pine Solar?

EIA-860M for August 2026 lists Yellow Pine Solar, LLC as the operator (EIA operator ID 65453). The operator is not always the owner.

Is Yellow Pine Solar a solar or a battery storage plant?

Both. Solar capacity totals 125 MW and battery storage capacity totals 65 MW.

When did Yellow Pine Solar start operating?

Its first generator began operating in July 2023, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page