Vinelands Power Plant
Hydro power plant in Mesa County, Colorado. 4.5 MW of nameplate capacity across 1 generator, operated by Grand Valley Power LLC.
Also known as EIA plant 68234
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 4.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2022First generator online
- Operator
- Grand Valley Power LLCEIA operator ID 65581
- Grid
- PSCOBalancing authority PSCO
- Price nodes
- None linkedNo verified ISO node
- Location
- Mesa County, CO39.1017, −108.3457
- EIA plant ID
- 68234EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Vinelands produces
Free · EIA-923Net generation, 2025
14.7 GWh
14,664 MWh, final
Capacity factor, 2025
37.2%
2024: 39.5%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2024 to 2025
14.7–15.6
GWh a year. Low 2025, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 15,631 | 39.5% | 12 of 12 |
| 2025 | 14,664 | 37.2% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 4.5 | November 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Grand Valley Power LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Vinelands Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Vinelands
Questions about Vinelands
How much power does Vinelands Power Plant produce?
Vinelands Power Plant reported 14,664 MWh (14.7 GWh) of net generation in 2025, a 37.2% capacity factor on 4.5 MW of nameplate capacity.
Where is Vinelands Power Plant?
Vinelands Power Plant is in Mesa County, Colorado, at 39.1017, −108.3457. It is in the Public Service Company of Colorado balancing area (PSCO).
Who operates Vinelands Power Plant?
EIA-860M for August 2026 lists Grand Valley Power LLC as the operator (EIA operator ID 65581). The operator is not always the owner.
When did Vinelands Power Plant start operating?
Its first generator began operating in November 2022, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page