SolarOperatingPSCO

Pivot Solar 40

Solar power plant in Weld County, Colorado. 2.8 MW of nameplate capacity across 1 generator, operated by Pivot Energy.

Also known as EIA plant 69483

Analyst: free account, 1 question a day.

CBEP Solar 5, LLCCBEP Solar 7Fort St VrainPivot Solar 405 km
Open in the map
6 plants within 9.2 km, from EIA coordinates.

Key facts

Capacity
2.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2026First generator online
Operator
Pivot EnergyEIA operator ID 65539
Grid
PSCOBalancing authority PSCO
Price nodes
None linkedNo verified ISO node
Location
Weld County, CO40.3181, −104.9277
EIA plant ID
69483EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pivot Solar 40 produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PS40Solar Photovoltaic2.8January 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pivot Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pivot Solar 40 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pivot Solar 40

More plants operated by Pivot Energy

Questions about Pivot Solar 40

Where is Pivot Solar 40?

Pivot Solar 40 is in Weld County, Colorado, at 40.3181, −104.9277. It is in the Public Service Company of Colorado balancing area (PSCO).

Who operates Pivot Solar 40?

EIA-860M for August 2026 lists Pivot Energy as the operator (EIA operator ID 65539). The operator is not always the owner.

When did Pivot Solar 40 start operating?

Its first generator began operating in January 2026, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page