Clover
Coal power plant in Halifax County, Virginia. 848 MW of nameplate capacity across 2 generators, operated by Virginia Electric & Power Co.
Also known as Clover Power Station · EIA plant 7213
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 848 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- October 1995First generator online
- Operator
- Virginia Electric & Power CoEIA operator ID 19876
- Grid
- PJMBalancing authority PJM
- Price nodes
- 2 PJM nodesResource nodes with prices
- Location
- Halifax County, VA36.8690, −78.7040
- EIA plant ID
- 7213EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Clover produces
Free · EIA-923Net generation, 2025
1.64 TWh
1,643,625 MWh, final
Capacity factor, 2025
22.1%
2024: 12.2%
January to July 2026
876 GWh
Provisional
Range, 2015 to 2025
0.2–5.5
TWh a year. Low 2023, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 6,856,713 | Not reported | 12 of 12 |
| 2001 | 6,684,781 | Not reported | 12 of 12 |
| 2002 | 6,307,712 | Not reported | 12 of 12 |
| 2003 | 6,424,844 | Not reported | 12 of 12 |
| 2004 | 6,685,138 | Not reported | 12 of 12 |
| 2005 | 6,386,114 | Not reported | 12 of 12 |
| 2006 | 6,942,867 | Not reported | 12 of 12 |
| 2007 | 6,676,803 | Not reported | 12 of 12 |
| 2008 | 5,809,328 | Not reported | 12 of 12 |
| 2009 | 5,587,711 | Not reported | 12 of 12 |
| 2010 | 6,193,652 | 83.4% | 12 of 12 |
| 2011 | 5,176,732 | 69.7% | 12 of 12 |
| 2012 | 4,400,124 | 59.1% | 12 of 12 |
| 2013 | 5,919,319 | Not reported | 12 of 12 |
| 2014 | 5,678,306 | 76.4% | 12 of 12 |
| 2015 | 5,484,916 | 73.8% | 12 of 12 |
| 2016 | 5,444,917 | 73.1% | 12 of 12 |
| 2017 | 3,266,582 | 44.0% | 12 of 12 |
| 2018 | 2,917,180 | 39.3% | 12 of 12 |
| 2019 | 1,281,310 | 17.2% | 12 of 12 |
| 2020 | 1,240,625 | 16.7% | 12 of 12 |
| 2021 | 892,660 | 12.0% | 12 of 12 |
| 2022 | 631,232 | 8.5% | 12 of 12 |
| 2023 | 247,929 | 3.3% | 12 of 12 |
| 2024 | 908,475 | 12.2% | 12 of 12 |
| 2025 | 1,643,625 | 22.1% | 12 of 12 |
| 2026 (provisional, partial year) | 876,001 | 20.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2025
1.91M
US short tons. 2024: 1.08M
SO₂, 2025
483
US short tons
NOx, 2025
2,429
US short tons
CO₂ per MWh, calculated
1.16 t
About 2,322 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 7213 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
72
million gallons
Consumption, 2024
52
million gallons
Source
Roanoke River
Surface, Fresh. Induced-draft tower
Watershed stress
Very low/none · 0.146
USGS SUI, HUC12 Sandy Creek-Roanoke River
12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Conventional Steam Coal | 424.0 | October 1995 |
| 2 | Conventional Steam Coal | 424.0 | March 1996 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Virginia Electric & Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Clover and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Clover
More plants operated by Virginia Electric & Power Co
Questions about Clover
How much power does Clover produce?
Clover reported 1,643,625 MWh (1.64 TWh) of net generation in 2025, a 22.1% capacity factor on 848 MW of nameplate capacity. From January to July 2026 it reported 876 GWh, which is provisional.
Where is Clover?
Clover is in Halifax County, Virginia, at 36.8690, −78.7040. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Clover?
EIA-860M for August 2026 lists Virginia Electric & Power Co as the operator (EIA operator ID 19876). The operator is not always the owner.
When did Clover start operating?
Its first generator began operating in October 1995, according to EIA-860M.
Does InfraMap have power prices for Clover?
Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Clover, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page