OilOperating

Galena Electric Utility

Oil power plant in Yukon Koyukuk, Alaska. 2.6 MW of nameplate capacity across 4 generators, operated by Galena Electric Utility.

Also known as EIA plant 7437

Analyst: free account, 1 question a day.

Galena Electric Utility500 m
Open in the map
No other mapped plant within 60 km.

Key facts

Capacity
2.6 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
May 2004First generator online
Operator
Galena Electric UtilityEIA operator ID 6915
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Yukon Koyukuk, AK64.7442, −156.8736
EIA plant ID
7437EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Galena Electric Utility produces

Free · EIA-923

Net generation, 2025

4.81 GWh

4,811 MWh, final

Capacity factor, 2025

Not reported

2024: 16.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

4.5–5.9

GWh a year. Low 2024, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20028,851Not reported12 of 12
20039,578Not reported12 of 12
20049,466Not reported12 of 12
20058,944Not reported12 of 12
20068,746Not reported12 of 12
20077,881Not reported12 of 12
2008Not reportedNot reported0 of 12
20096,096Not reported12 of 12
20106,02216.4%12 of 12
20115,88316.0%12 of 12
20125,80215.7%12 of 12
20135,683Not reported12 of 12
20145,69716.7%12 of 12
20155,449Not reported12 of 12
20165,390Not reported12 of 12
20175,54316.2%12 of 12
20185,55016.2%12 of 12
20195,88617.2%12 of 12
20205,36315.7%12 of 12
20214,95514.5%12 of 12
20225,252Not reported12 of 12
2023Not reportedNot reported0 of 12
20244,45616.4%12 of 12
20254,811Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3BPetroleum Liquids0.4September 2022
4APetroleum Liquids1.0May 2004
5APetroleum Liquids0.8June 2009
6BPetroleum Liquids0.4September 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Galena Electric Utility as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Galena Electric Utility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Galena Electric Utility

Questions about Galena Electric Utility

How much power does Galena Electric Utility produce?

Galena Electric Utility reported 4,811 MWh (4.81 GWh) of net generation in 2025.

Where is Galena Electric Utility?

Galena Electric Utility is in Yukon Koyukuk, Alaska, at 64.7442, −156.8736.

Who operates Galena Electric Utility?

EIA-860M for August 2026 lists Galena Electric Utility as the operator (EIA operator ID 6915). The operator is not always the owner.

When did Galena Electric Utility start operating?

Its first generator began operating in May 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page