Natural gasOilOperating

Hank Nikkels Plant 1

Natural gas power plant in Anchorage, Alaska. 50.9 MW of nameplate capacity across 2 generators, operated by Chugach Electric Assn Inc.

Also known as Hank Nikkels Plant · Anchorage 1 · EIA plant 75

Analyst: free account, 1 question a day.

International Battery…Southcentral Power ProjectGeorge M Sullivan Gen…JBER Landfill Gas Power PlantFire Island WindHank Nikkels Plant 110 km
Open in the map
5 plants within 23 km, from EIA coordinates.

Key facts

Capacity
50.9 MWNatural gas 48.9 · Oil 2.0
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2007First generator online
Operator
Chugach Electric Assn IncEIA operator ID 3522
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Anchorage, AK61.2221, −149.8661
EIA plant ID
75EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hank Nikkels Plant 1 produces

Free · EIA-923

Net generation, 2025

850 MWh

850 MWh, final. 1 of 12 months reported

Capacity factor, 2025

1.5%

2024: 6.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2024

7.6–50.8

GWh a year. Low 2020, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200010,427Not reported12 of 12
200122,866Not reported12 of 12
200241,958Not reported12 of 12
200320,657Not reported12 of 12
200444,732Not reported12 of 12
200530,076Not reported12 of 12
200626,381Not reported12 of 12
200753,560Not reported12 of 12
20086,552Not reported1 of 12
200993,724Not reported12 of 12
201055,428Not reported12 of 12
201191,33910.3%12 of 12
201248,812Not reported11 of 12
201322,3372.5%12 of 12
201433,6423.7%12 of 12
201547,7825.3%12 of 12
201645,082Not reported12 of 12
201750,8497.5%12 of 12
201828,9374.2%12 of 12
201914,7372.2%12 of 12
20207,6461.1%12 of 12
20211840.3%1 of 12
202217,8262.6%12 of 12
202337,0675.4%12 of 12
202441,2126.0%12 of 12
20258501.5%1 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3RNatural Gas Fired Combustion Turbine48.9August 2007
P1 BSPetroleum Liquids2.0February 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Chugach Electric Assn Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hank Nikkels Plant 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hank Nikkels Plant 1

More plants operated by Chugach Electric Assn Inc

Questions about Hank Nikkels Plant 1

How much power does Hank Nikkels Plant 1 produce?

Hank Nikkels Plant 1 reported 850 MWh (850 MWh) of net generation in 2025, a 1.5% capacity factor on 50.9 MW of nameplate capacity. 1 of 12 months were reported for 2025.

Where is Hank Nikkels Plant 1?

Hank Nikkels Plant 1 is in Anchorage, Alaska, at 61.2221, −149.8661.

Who operates Hank Nikkels Plant 1?

EIA-860M for August 2026 lists Chugach Electric Assn Inc as the operator (EIA operator ID 3522). The operator is not always the owner.

When did Hank Nikkels Plant 1 start operating?

Its first generator began operating in August 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page