Lake Blackshear Project

Hydro power plant in Worth County, Georgia. 17.2 MW of nameplate capacity across 4 generators, operated by Crisp County Power Comm.

Also known as Crisp County Hydroelectric Power Dam · EIA plant 752

Analyst: free account, 1 question a day.

SR DeSoto IIFlint RiverBrady Solar LLCLake Blackshear Project20 km
Open in the map
6 plants within 34 km, from EIA coordinates.

Key facts

Capacity
17.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
May 1930First generator online
Operator
Crisp County Power CommEIA operator ID 4538
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Worth County, GA31.8477, −83.9420
EIA plant ID
752EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lake Blackshear Project produces

Free · EIA-923

Net generation, 2025

34.6 GWh

34,556 MWh, final

Capacity factor, 2025

22.9%

2024: 24.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

34.6–49.9

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200136,904Not reported12 of 12
200233,609Not reported12 of 12
200358,311Not reported12 of 12
200445,061Not reported12 of 12
200547,685Not reported12 of 12
200635,372Not reported12 of 12
200727,534Not reported12 of 12
200835,731Not reported12 of 12
200941,212Not reported12 of 12
201041,62327.6%12 of 12
201127,53118.3%12 of 12
201219,35912.8%12 of 12
201350,45933.5%12 of 12
201443,16228.6%12 of 12
201547,41331.5%12 of 12
201637,67124.9%12 of 12
201740,02726.6%12 of 12
201845,24830.0%12 of 12
201940,77527.1%12 of 12
202049,41632.7%12 of 12
202149,92433.1%12 of 12
202240,84227.1%12 of 12
202342,85928.4%12 of 12
202436,32924.0%12 of 12
202534,55622.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric2.4August 1930
2Conventional Hydroelectric5.0August 1930
3Conventional Hydroelectric4.8May 1930
4Conventional Hydroelectric5.0May 1930

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Crisp County Power Comm as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lake Blackshear Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lake Blackshear Project

More plants operated by Crisp County Power Comm

Questions about Lake Blackshear Project

How much power does Lake Blackshear Project produce?

Lake Blackshear Project reported 34,556 MWh (34.6 GWh) of net generation in 2025, a 22.9% capacity factor on 17.2 MW of nameplate capacity.

Where is Lake Blackshear Project?

Lake Blackshear Project is in Worth County, Georgia, at 31.8477, −83.9420. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Lake Blackshear Project?

EIA-860M for August 2026 lists Crisp County Power Comm as the operator (EIA operator ID 4538). The operator is not always the owner.

When did Lake Blackshear Project start operating?

Its first generator began operating in May 1930, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page