Natural gasOperatingSOCO

MPC Generating

Natural gas power plant in Walton County, Georgia. 386.1 MW of nameplate capacity across 2 generators, operated by MPC Generating, LLC.

Also known as MPC Generating Power Plant · EIA plant 7764

Analyst: free account, 1 question a day.

Doyle Energy FacilityGratis Road Solar FacilityPleasant Valley SolarMPC Generating5 km
Open in the map
5 plants within 8.4 km, from EIA coordinates.

Key facts

Capacity
386.1 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 2000First generator online
Operator
MPC Generating, LLCEIA operator ID 59960
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Walton County, GA33.8119, −83.6953
EIA plant ID
7764EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power MPC Generating produces

Free · EIA-923

Net generation, 2025

128 GWh

127,534 MWh, final

Capacity factor, 2025

3.8%

2024: 1.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

6.3–149.0

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200243,810Not reported12 of 12
200317,282Not reported12 of 12
20041,233Not reported12 of 12
20055,609Not reported12 of 12
20060Not reported12 of 12
200716,852Not reported12 of 12
20085,881Not reported12 of 12
20095,482Not reported12 of 12
201021,7820.6%12 of 12
201117,3620.5%12 of 12
201256,5431.7%12 of 12
20136,0510.2%12 of 12
20144,3500.1%12 of 12
201522,3340.7%12 of 12
201618,3090.5%12 of 12
201714,5850.4%12 of 12
201818,5290.5%12 of 12
201910,4960.3%12 of 12
20206,3180.2%12 of 12
202118,0960.5%12 of 12
2022148,9754.4%12 of 12
202338,1621.1%12 of 12
202438,7851.1%12 of 12
2025127,5343.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

88,760

US short tons. 2024: 27,268

SO₂, 2025

0

US short tons

NOx, 2025

83

US short tons

CO₂ per MWh, calculated

0.70 t

About 1,392 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 7764 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine185.4January 2000
2Natural Gas Fired Combustion Turbine200.7January 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MPC Generating, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query MPC Generating and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near MPC Generating

Questions about MPC Generating

How much power does MPC Generating produce?

MPC Generating reported 127,534 MWh (128 GWh) of net generation in 2025, a 3.8% capacity factor on 386.1 MW of nameplate capacity.

Where is MPC Generating?

MPC Generating is in Walton County, Georgia, at 33.8119, −83.6953. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates MPC Generating?

EIA-860M for August 2026 lists MPC Generating, LLC as the operator (EIA operator ID 59960). The operator is not always the owner.

When did MPC Generating start operating?

Its first generator began operating in January 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page