HydroOperatingPACE

Upper Power Plant

Hydro power plant in Bonneville County, Idaho. 8 MW of nameplate capacity across 1 generator, operated by City of Idaho Falls - (ID).

Also known as EIA plant 844

Analyst: free account, 1 question a day.

City Power PlantLower No 1Lower No 2Gem StateGoshen Phase IIMeadow Creek Project CompanyUpper10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1982First generator online
Operator
City of Idaho Falls - (ID)EIA operator ID 9187
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Bonneville County, ID43.5527, −112.0510
EIA plant ID
844EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Upper produces

Free · EIA-923

Net generation, 2025

44.8 GWh

44,780 MWh, final

Capacity factor, 2025

63.9%

2024: 63.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

7.0–53.9

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200135,089Not reported12 of 12
200239,248Not reported12 of 12
200337,293Not reported12 of 12
200442,982Not reported12 of 12
200543,223Not reported12 of 12
200649,894Not reported12 of 12
200746,947Not reported12 of 12
200824,299Not reported12 of 12
200923,355Not reported12 of 12
201046,02265.7%12 of 12
201148,91369.8%12 of 12
201258,31383.0%12 of 12
201345,97865.6%12 of 12
201445,75565.3%12 of 12
201549,98971.3%12 of 12
201642,60760.6%12 of 12
201753,91176.9%12 of 12
201852,41874.8%12 of 12
201950,59872.2%12 of 12
202051,51473.3%12 of 12
202142,19460.2%12 of 12
202242,24660.3%12 of 12
20237,02010.0%12 of 12
202444,90063.9%12 of 12
202544,78063.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Conventional Hydroelectric8.0September 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Idaho Falls - (ID) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Upper Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Upper

More plants operated by City of Idaho Falls - (ID)

Questions about Upper

How much power does Upper Power Plant produce?

Upper Power Plant reported 44,780 MWh (44.8 GWh) of net generation in 2025, a 63.9% capacity factor on 8 MW of nameplate capacity.

Where is Upper Power Plant?

Upper Power Plant is in Bonneville County, Idaho, at 43.5527, −112.0510. It is in the PacifiCorp - East balancing area (PACE).

Who operates Upper Power Plant?

EIA-860M for August 2026 lists City of Idaho Falls - (ID) as the operator (EIA operator ID 9187). The operator is not always the owner.

When did Upper Power Plant start operating?

Its first generator began operating in September 1982, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page