CoalOperatingMISO

Baldwin Energy Complex

Coal power plant in Randolph County, Illinois. 1,259.6 MW of nameplate capacity across 2 generators, operated by Dynegy Midwest Generation Inc.

Also known as EIA plant 889

Analyst: free account, 1 question a day.

SV CSG Wagner B LLCRed BudSV CSG Wagner A LLCTilden SolarPrairie State Generating StationBaldwin Energy Complex5 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
1,259.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1970First generator online
Operator
Dynegy Midwest Generation IncEIA operator ID 5517
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Randolph County, IL38.2050, −89.8544
EIA plant ID
889EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Baldwin Energy Complex produces

Free · EIA-923

Net generation, 2025

6.51 TWh

6,509,621 MWh, final

Capacity factor, 2025

59.0%

2024: 58.6%

January to July 2026

3.15 TWh

Provisional

Range, 2015 to 2025

4.1–10.3

TWh a year. Low 2020, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200010,360,485Not reported12 of 12
200110,931,111Not reported12 of 12
200211,490,535Not reported11 of 12
200313,090,406Not reported12 of 12
200413,168,092Not reported12 of 12
200512,618,528Not reported12 of 12
200612,645,402Not reported12 of 12
200713,486,086Not reported12 of 12
200813,073,751Not reported12 of 12
200912,185,940Not reported12 of 12
201012,712,78176.6%12 of 12
201112,426,77281.1%11 of 12
201212,285,50773.8%12 of 12
201312,529,27975.5%12 of 12
2014Not reportedNot reported0 of 12
201510,305,80762.1%12 of 12
20169,793,431Not reported12 of 12
20177,874,33947.5%12 of 12
20187,209,38643.5%12 of 12
20196,291,99337.9%12 of 12
20204,060,737Not reported12 of 12
20216,885,33962.4%12 of 12
20225,923,025Not reported12 of 12
2023541,28657.8%1 of 12
20246,487,38958.6%12 of 12
20256,509,62159.0%12 of 12
2026 (provisional, partial year)3,154,15649.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

6.81M

US short tons. 2024: 6.97M

SO₂, 2025

2,264

US short tons

NOx, 2025

2,436

US short tons

CO₂ per MWh, calculated

1.05 t

About 2,091 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 889 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

397,678

million gallons

Consumption, 2024

5,327

million gallons

Source

Baldwin Lake, Kaskaskia River

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Low · 0.242

USGS SUI, HUC12 Baldwin Lake-Kaskaskia River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal625.1July 1970
2Conventional Steam Coal634.5March 1973

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dynegy Midwest Generation Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Baldwin Energy Complex and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Baldwin Energy Complex

Questions about Baldwin Energy Complex

How much power does Baldwin Energy Complex produce?

Baldwin Energy Complex reported 6,509,621 MWh (6.51 TWh) of net generation in 2025, a 59.0% capacity factor on 1,259.6 MW of nameplate capacity. From January to July 2026 it reported 3.15 TWh, which is provisional.

Where is Baldwin Energy Complex?

Baldwin Energy Complex is in Randolph County, Illinois, at 38.2050, −89.8544. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Baldwin Energy Complex?

EIA-860M for August 2026 lists Dynegy Midwest Generation Inc as the operator (EIA operator ID 5517). The operator is not always the owner.

When did Baldwin Energy Complex start operating?

Its first generator began operating in July 1970, according to EIA-860M.

Does InfraMap have power prices for Baldwin Energy Complex?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Baldwin Energy Complex, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page