City of Peru Plank Road Generating Station
Oil power plant in LaSalle County, Illinois. 13.5 MW of nameplate capacity across 5 generators, operated by City of Peru - (IL).
Also known as EIA plant 955
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 13.5 MWNameplate
- Generators
- 5 operatingEIA-860M, August 2026
- Operating since
- April 2011First generator online
- Operator
- City of Peru - (IL)EIA operator ID 14840
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- LaSalle County, IL41.3533, −89.1391
- EIA plant ID
- 955EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power City of Peru Plank Road produces
Free · EIA-923Net generation, 2025
17.4 GWh
17,449 MWh, final
Capacity factor, 2025
14.8%
2024: Not reported
January to July 2026
10.2 GWh
Provisional
Range, 2015 to 2025
15.8–40.4
GWh a year. Low 2024, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 0 | Not reported | 12 of 12 |
| 2001 | 41,866 | Not reported | 12 of 12 |
| 2002 | 34,764 | Not reported | 12 of 12 |
| 2003 | 41,286 | Not reported | 12 of 12 |
| 2004 | 42,680 | Not reported | 12 of 12 |
| 2005 | 37,073 | Not reported | 12 of 12 |
| 2006 | 49,535 | Not reported | 12 of 12 |
| 2007 | 38,640 | Not reported | 12 of 12 |
| 2008 | 36,854 | Not reported | 12 of 12 |
| 2009 | 28,394 | Not reported | 12 of 12 |
| 2010 | 30,442 | 9.4% | 12 of 12 |
| 2011 | 33,529 | Not reported | 12 of 12 |
| 2012 | 37,795 | 11.8% | 12 of 12 |
| 2013 | 35,314 | 11.0% | 12 of 12 |
| 2014 | 35,730 | 11.2% | 12 of 12 |
| 2015 | 32,609 | 10.2% | 12 of 12 |
| 2016 | 40,418 | 12.6% | 12 of 12 |
| 2017 | 29,214 | 9.1% | 12 of 12 |
| 2018 | 38,700 | 12.1% | 12 of 12 |
| 2019 | 26,632 | 8.3% | 12 of 12 |
| 2020 | 36,780 | 11.5% | 12 of 12 |
| 2021 | 40,210 | 12.6% | 12 of 12 |
| 2022 | 31,640 | 9.9% | 12 of 12 |
| 2023 | 33,034 | 10.3% | 12 of 12 |
| 2024 | 15,792 | Not reported | 12 of 12 |
| 2025 | 17,449 | 14.8% | 12 of 12 |
| 2026 (provisional, partial year) | 10,186 | 14.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 11 | Petroleum Liquids | 2.7 | April 2011 |
| 12 | Petroleum Liquids | 2.7 | April 2011 |
| 13 | Petroleum Liquids | 2.7 | April 2011 |
| 14 | Petroleum Liquids | 2.7 | April 2011 |
| 15 | Petroleum Liquids | 2.7 | April 2011 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Peru - (IL) as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query City of Peru Plank Road Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near City of Peru Plank Road
More plants operated by City of Peru - (IL)
Questions about City of Peru Plank Road
How much power does City of Peru Plank Road Generating Station produce?
City of Peru Plank Road Generating Station reported 17,449 MWh (17.4 GWh) of net generation in 2025, a 14.8% capacity factor on 13.5 MW of nameplate capacity. From January to July 2026 it reported 10.2 GWh, which is provisional.
Where is City of Peru Plank Road Generating Station?
City of Peru Plank Road Generating Station is in LaSalle County, Illinois, at 41.3533, −89.1391. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates City of Peru Plank Road Generating Station?
EIA-860M for August 2026 lists City of Peru - (IL) as the operator (EIA operator ID 14840). The operator is not always the owner.
When did City of Peru Plank Road Generating Station start operating?
Its first generator began operating in April 2011, according to EIA-860M.
Does InfraMap have power prices for City of Peru Plank Road Generating Station?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to City of Peru Plank Road Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page