CoalOperatingPJM

Clifty Creek

Coal power plant in Jefferson County, Indiana. 1,303.8 MW of nameplate capacity across 6 generators, operated by Indiana-Kentucky Electric Corp.

Also known as Clifty Creek Generating Station · EIA plant 983

Analyst: free account, 1 question a day.

Trimble CountyScottsburg Solar ParkGhentNabb Battery Energy Storage SystemBluegrass Generating StationClifty Creek20 km
Open in the map
6 plants within 39 km, from EIA coordinates.

Key facts

Capacity
1,303.8 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
February 1955First generator online
Operator
Indiana-Kentucky Electric CorpEIA operator ID 9269
Grid
PJMBalancing authority PJM
Price nodes
6 PJM nodesResource nodes with prices
Location
Jefferson County, IN38.7378, −85.4206
EIA plant ID
983EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Clifty Creek produces

Free · EIA-923

Net generation, 2025

5.78 TWh

5,779,878 MWh, final

Capacity factor, 2025

50.6%

2024: 45.2%

January to July 2026

3.64 TWh

Provisional

Range, 2015 to 2025

4.4–6.4

TWh a year. Low 2020, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20008,368,345Not reported12 of 12
20018,025,400Not reported12 of 12
20027,838,812Not reported12 of 12
20037,004,637Not reported12 of 12
20048,380,898Not reported12 of 12
20058,981,019Not reported12 of 12
20069,128,635Not reported12 of 12
20078,299,337Not reported12 of 12
20088,415,451Not reported12 of 12
20098,353,045Not reported12 of 12
20107,898,624Not reported12 of 12
20117,948,26769.6%12 of 12
20125,945,61751.9%12 of 12
20135,610,367Not reported12 of 12
20146,062,46353.1%12 of 12
20155,225,15445.7%12 of 12
20165,030,84843.9%12 of 12
20176,037,63552.9%12 of 12
20186,369,30555.8%12 of 12
20195,722,97950.1%12 of 12
20204,375,31438.2%12 of 12
20215,034,22344.1%12 of 12
20225,813,74150.9%12 of 12
20234,967,14043.5%12 of 12
20245,174,52645.2%12 of 12
20255,779,87850.6%12 of 12
2026 (provisional, partial year)3,638,68954.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

6.56M

US short tons. 2024: 5.86M

SO₂, 2025

2,734

US short tons

NOx, 2025

4,935

US short tons

CO₂ per MWh, calculated

1.14 t

About 2,271 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 983 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

350,993

million gallons

Consumption, 2024

0

million gallons

Source

Ohio River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.125

USGS SUI, HUC12 Crooked Creek-Ohio River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal217.3February 1955
2Conventional Steam Coal217.3May 1955
3Conventional Steam Coal217.3July 1955
4Conventional Steam Coal217.3October 1955
5Conventional Steam Coal217.3November 1955
6Conventional Steam Coal217.3March 1956

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Indiana-Kentucky Electric Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Clifty Creek and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Clifty Creek

Questions about Clifty Creek

How much power does Clifty Creek produce?

Clifty Creek reported 5,779,878 MWh (5.78 TWh) of net generation in 2025, a 50.6% capacity factor on 1,303.8 MW of nameplate capacity. From January to July 2026 it reported 3.64 TWh, which is provisional.

Where is Clifty Creek?

Clifty Creek is in Jefferson County, Indiana, at 38.7378, −85.4206. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Clifty Creek?

EIA-860M for August 2026 lists Indiana-Kentucky Electric Corp as the operator (EIA operator ID 9269). The operator is not always the owner.

When did Clifty Creek start operating?

Its first generator began operating in February 1955, according to EIA-860M.

Does InfraMap have power prices for Clifty Creek?

Yes. InfraMap has PJM day-ahead and real-time prices at 6 price nodes linked to Clifty Creek, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page