Natural gasOperatingMISO

CC Perry K

Natural gas power plant in Marion County, Indiana. 5 MW of nameplate capacity across 1 generator, operated by Citizens Thermal Energy.

Also known as EIA plant 992

Analyst: free account, 1 question a day.

Covanta Indianapolis EnergyMaywood Photovoltaic ProjectBelmontHarding StreetIndianapolis Motor Speedway Solar PVIndy GrocersCC Perry K2 km
Open in the map
6 plants within 6.7 km, from EIA coordinates.

Key facts

Capacity
5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 1938First generator online
Operator
Citizens Thermal EnergyEIA operator ID 3599
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Marion County, IN39.7631, −86.1667
EIA plant ID
992EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CC Perry K produces

Free · EIA-923

Net generation, 2025

11.1 GWh

11,085 MWh, final

Capacity factor, 2025

25.3%

2024: Not reported

January to July 2026

8.98 GWh

Provisional

Range, 2015 to 2025

7.8–31.7

GWh a year. Low 2015, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000−2,375Not reported12 of 12
200111,921Not reported12 of 12
200221,899Not reported12 of 12
2003Not reportedNot reported0 of 12
2004104,269Not reported12 of 12
2005Not reportedNot reported0 of 12
200617,524Not reported12 of 12
20072,340Not reported12 of 12
20081,032Not reported12 of 12
200910,269Not reported12 of 12
201010,2245.0%12 of 12
201114,0926.9%12 of 12
20127,3663.6%12 of 12
20137,6163.7%12 of 12
20148,231Not reported12 of 12
20157,7843.8%12 of 12
201631,67115.4%12 of 12
201720,60410.1%12 of 12
201817,2798.4%12 of 12
201924,08911.8%12 of 12
202027,95937.9%12 of 12
202115,18720.6%12 of 12
202217,15523.3%12 of 12
202310,55914.4%12 of 12
20248,169Not reported12 of 12
202511,08525.3%12 of 12
2026 (provisional, partial year)8,97535.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

Not reported

US short tons

NOx, 2025

285

US short tons

1 of 5 EPA units reported CO₂ in 2025 (11, 12, 13, 14, 15, 16), matched to EIA plant 992 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
6Natural Gas Steam Turbine5.0July 1938

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Citizens Thermal Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CC Perry K and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CC Perry K

Questions about CC Perry K

How much power does CC Perry K produce?

CC Perry K reported 11,085 MWh (11.1 GWh) of net generation in 2025, a 25.3% capacity factor on 5 MW of nameplate capacity. From January to July 2026 it reported 8.98 GWh, which is provisional.

Where is CC Perry K?

CC Perry K is in Marion County, Indiana, at 39.7631, −86.1667. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates CC Perry K?

EIA-860M for August 2026 lists Citizens Thermal Energy as the operator (EIA operator ID 3599). The operator is not always the owner.

When did CC Perry K start operating?

Its first generator began operating in July 1938, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page