Key facts

Capacity
101.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 1988First generator online
Operator
Boise-Kuna Irrigation DistrictEIA operator ID 1932
Grid
IPCOBalancing authority IPCO
Price nodes
None linkedNo verified ISO node
Location
Ada County, ID43.5280, −116.0583
EIA plant ID
10014EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lucky Peak Power Plant Project produces

Free · EIA-923

Net generation, 2025

311 GWh

311,167 MWh, final

Capacity factor, 2025

35.1%

2024: 32.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

221.7–463.3

GWh a year. Low 2021, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000340,748Not reported12 of 12
2001188,377Not reported12 of 12
2002288,801Not reported12 of 12
2003292,398Not reported12 of 12
2004325,011Not reported12 of 12
2005226,238Not reported12 of 12
2006406,766Not reported12 of 12
2007272,599Not reported12 of 12
2008311,029Not reported12 of 12
2009321,789Not reported12 of 12
2010285,58432.2%12 of 12
2011388,78043.9%12 of 12
2012401,31945.1%12 of 12
2013215,46824.3%12 of 12
2014308,11234.8%12 of 12
2015277,86431.3%12 of 12
2016340,29638.3%12 of 12
2017463,31752.3%12 of 12
2018347,57039.2%12 of 12
2019363,87141.0%12 of 12
2020254,42828.6%12 of 12
2021221,66825.0%12 of 12
2022233,71926.4%12 of 12
2023331,84837.4%12 of 12
2024290,59132.7%12 of 12
2025311,16735.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
U131Conventional Hydroelectric45.0October 1988
U132Conventional Hydroelectric45.0October 1988
U133Conventional Hydroelectric11.2October 1988

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Boise-Kuna Irrigation District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lucky Peak Power Plant Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lucky Peak Power Plant Project

More plants operated by Boise-Kuna Irrigation District

Questions about Lucky Peak Power Plant Project

How much power does Lucky Peak Power Plant Project produce?

Lucky Peak Power Plant Project reported 311,167 MWh (311 GWh) of net generation in 2025, a 35.1% capacity factor on 101.2 MW of nameplate capacity.

Where is Lucky Peak Power Plant Project?

Lucky Peak Power Plant Project is in Ada County, Idaho, at 43.5280, −116.0583. It is in the Idaho Power Company balancing area (IPCO).

Who operates Lucky Peak Power Plant Project?

EIA-860M for August 2026 lists Boise-Kuna Irrigation District as the operator (EIA operator ID 1932). The operator is not always the owner.

When did Lucky Peak Power Plant Project start operating?

Its first generator began operating in October 1988, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page