HydroOperatingIPCO

Boise R Diversion

Hydro power plant in Ada County, Idaho. 3.3 MW of nameplate capacity across 3 generators, operated by U S Bureau of Reclamation.

Also known as EIA plant 6397

Analyst: free account, 1 question a day.

Lucky Peak Power Plant ProjectBoise Bench BESSArrowrock Hydroelectric ProjectOrchard Ranch SolarMC6 Hydro FacilityBoise R Diversion10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
3.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2004First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
IPCOBalancing authority IPCO
Price nodes
None linkedNo verified ISO node
Location
Ada County, ID43.5377, −116.0938
EIA plant ID
6397EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Boise R Diversion produces

Free · EIA-923

Net generation, 2025

73 MWh

73 MWh, final

Capacity factor, 2025

0.3%

2024: 27.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.1–11.8

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
20010Not reported12 of 12
20020Not reported12 of 12
20030Not reported12 of 12
20047,266Not reported12 of 12
200510,588Not reported12 of 12
200614,881Not reported12 of 12
20079,337Not reported12 of 12
20089,975Not reported12 of 12
20097,468Not reported12 of 12
20109,05431.3%12 of 12
20119,20031.8%12 of 12
201210,98637.9%12 of 12
20137,99827.7%12 of 12
20147,03824.3%12 of 12
20158,25228.5%12 of 12
20168,84930.5%12 of 12
201711,82540.9%12 of 12
20189,86634.1%12 of 12
20198,72930.2%12 of 12
20205,72519.8%12 of 12
20214,40915.3%12 of 12
20225,42918.8%12 of 12
20238,58529.7%12 of 12
20247,89127.2%12 of 12
2025730.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1AConventional Hydroelectric1.1June 2004
2AConventional Hydroelectric1.1June 2004
3AConventional Hydroelectric1.1June 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Boise R Diversion and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Boise R Diversion

More plants operated by U S Bureau of Reclamation

Questions about Boise R Diversion

How much power does Boise R Diversion produce?

Boise R Diversion reported 73 MWh (73 MWh) of net generation in 2025, a 0.3% capacity factor on 3.3 MW of nameplate capacity.

Where is Boise R Diversion?

Boise R Diversion is in Ada County, Idaho, at 43.5377, −116.0938. It is in the Idaho Power Company balancing area (IPCO).

Who operates Boise R Diversion?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Boise R Diversion start operating?

Its first generator began operating in June 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page