HydroOperatingBPAT

Hungry Horse

Hydro power plant in Flathead County, Montana. 428 MW of nameplate capacity across 4 generators, operated by U S Bureau of Reclamation.

Also known as Hungry Horse Power Plant · EIA plant 2203

Analyst: free account, 1 question a day.

Stoltze CoGen1Big ForkHungry Horse20 km
Open in the map
3 plants within 32 km, from EIA coordinates.

Key facts

Capacity
428 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
October 1952First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Flathead County, MT48.3415, −114.0144
EIA plant ID
2203EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hungry Horse produces

Free · EIA-923

Net generation, 2025

633 GWh

632,884 MWh, final

Capacity factor, 2025

16.9%

2024: 19.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.6–1.0

TWh a year. Low 2025, high 2017

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,016,427Not reported12 of 12
2001537,371Not reported12 of 12
2002994,748Not reported12 of 12
2003729,010Not reported12 of 12
2004812,973Not reported12 of 12
2005850,916Not reported12 of 12
20061,055,468Not reported12 of 12
2007777,371Not reported12 of 12
20081,217,419Not reported12 of 12
2009742,284Not reported12 of 12
2010834,21322.2%12 of 12
20111,378,43736.8%12 of 12
20121,062,67728.3%12 of 12
20131,023,38527.3%12 of 12
20141,004,87126.8%12 of 12
20151,000,29826.7%12 of 12
2016835,16222.2%12 of 12
20171,034,47527.6%12 of 12
2018998,99026.6%12 of 12
2019658,94117.6%12 of 12
2020925,70924.6%12 of 12
2021953,33125.4%12 of 12
20221,008,01926.9%12 of 12
2023650,16517.3%12 of 12
2024730,34119.4%12 of 12
2025632,88416.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric107.0October 1952
2Conventional Hydroelectric107.0December 1952
3Conventional Hydroelectric107.0July 1953
4Conventional Hydroelectric107.0July 1953

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hungry Horse and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hungry Horse

More plants operated by U S Bureau of Reclamation

Questions about Hungry Horse

How much power does Hungry Horse produce?

Hungry Horse reported 632,884 MWh (633 GWh) of net generation in 2025, a 16.9% capacity factor on 428 MW of nameplate capacity.

Where is Hungry Horse?

Hungry Horse is in Flathead County, Montana, at 48.3415, −114.0144. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Hungry Horse?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Hungry Horse start operating?

Its first generator began operating in October 1952, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page