HydroOperatingWALC

Hoover Dam (NV)

Hydro power plant in Clark County, Nevada. 1,039.4 MW of nameplate capacity across 9 generators, operated by U S Bureau of Reclamation.

Also known as EIA plant 154

Analyst: free account, 1 question a day.

Townsite Solar Project HybridTechren Solar VHoover Dam (NV)10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
1,039.4 MWNameplate
Generators
9 operatingEIA-860M, August 2026
Operating since
September 1936First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
WALCBalancing authority WALC
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.0155, −114.7380
EIA plant ID
154EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hoover Dam (NV) produces

Free · EIA-923

Net generation, 2025

1.81 TWh

1,807,912 MWh, final

Capacity factor, 2025

19.9%

2024: 16.8%

January to July 2026

848 GWh

Provisional

Range, 2015 to 2025

1.2–2.2

TWh a year. Low 2023, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,369,423Not reported12 of 12
20012,453,528Not reported12 of 12
20022,224,941Not reported12 of 12
20031,701,496Not reported12 of 12
20041,581,084Not reported12 of 12
20051,668,986Not reported12 of 12
20062,020,029Not reported12 of 12
20071,959,593Not reported12 of 12
20081,709,695Not reported12 of 12
20092,406,695Not reported12 of 12
20102,097,07923.0%12 of 12
20112,118,10523.3%12 of 12
20122,374,14826.0%12 of 12
20132,624,63328.8%12 of 12
20142,352,30825.8%12 of 12
20152,248,64924.7%12 of 12
20161,748,12219.1%12 of 12
20171,738,88319.1%12 of 12
20181,814,64619.9%12 of 12
20192,175,71523.9%12 of 12
20201,867,07020.4%12 of 12
20211,905,14520.9%12 of 12
20221,628,82217.9%12 of 12
20231,245,71313.7%12 of 12
20241,531,94916.8%12 of 12
20251,807,91219.9%12 of 12
2026 (provisional, partial year)848,36716.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
N0Conventional Hydroelectric2.4September 1936
N1Conventional Hydroelectric130.0December 1936
N2Conventional Hydroelectric130.0October 1936
N3Conventional Hydroelectric130.0March 1937
N4Conventional Hydroelectric130.0November 1936
N5Conventional Hydroelectric130.0June 1938
N6Conventional Hydroelectric130.0August 1938
N7Conventional Hydroelectric127.0November 1944
N8Conventional Hydroelectric130.0December 1961

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hoover Dam (NV) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hoover Dam (NV)

More plants operated by U S Bureau of Reclamation

Questions about Hoover Dam (NV)

How much power does Hoover Dam (NV) produce?

Hoover Dam (NV) reported 1,807,912 MWh (1.81 TWh) of net generation in 2025, a 19.9% capacity factor on 1,039.4 MW of nameplate capacity. From January to July 2026 it reported 848 GWh, which is provisional.

Where is Hoover Dam (NV)?

Hoover Dam (NV) is in Clark County, Nevada, at 36.0155, −114.7380. It is in the Western Area Power Administration - Desert Southwest Region balancing area (WALC).

Who operates Hoover Dam (NV)?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Hoover Dam (NV) start operating?

Its first generator began operating in September 1936, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page