HydroPumped storageOperatingBPAT

Grand Coulee

Hydro power plant in Grant County, Washington. 6,809 MW of nameplate capacity across 33 generators, operated by U S Bureau of Reclamation.

Also known as Grand Coulee Dam · EIA plant 6163

Analyst: free account, 1 question a day.

Main Canal HeadworksChief JosephSummer Falls Power PlantGrand Coulee25 km
Open in the map
3 plants within 56 km, from EIA coordinates.

Key facts

Capacity
6,809 MWHydro 6,495.0 · Pumped storage 314.0
Generators
33 operatingEIA-860M, August 2026
Operating since
March 1941First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Grant County, WA47.9575, −118.9773
EIA plant ID
6163EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Grand Coulee produces

Free · EIA-923

Net generation, 2025

16.2 TWh

16,151,147 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

12.8 TWh

Provisional

Range, 2015 to 2025

15.4–21.2

TWh a year. Low 2024, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200021,765,745Not reported12 of 12
200113,436,902Not reported12 of 12
200221,247,276Not reported12 of 12
200319,022,789Not reported12 of 12
200418,917,123Not reported12 of 12
200520,474,048Not reported12 of 12
200621,478,328Not reported12 of 12
200721,632,495Not reported12 of 12
200822,315,158Not reported12 of 12
200920,987,193Not reported12 of 12
201018,351,775Not reported12 of 12
201124,566,893Not reported12 of 12
201226,461,174Not reported12 of 12
201321,073,181Not reported12 of 12
201420,261,569Not reported12 of 12
201518,878,623Not reported12 of 12
201619,011,492Not reported12 of 12
201720,983,990Not reported12 of 12
201821,042,561Not reported12 of 12
201916,639,421Not reported12 of 12
202020,290,172Not reported12 of 12
202118,325,318Not reported12 of 12
202221,176,202Not reported12 of 12
202315,582,026Not reported12 of 12
202415,443,458Not reported12 of 12
202516,151,147Not reported12 of 12
2026 (provisional, partial year)12,841,304Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric125.0April 1942
2Conventional Hydroelectric125.0January 1942
3Conventional Hydroelectric125.0September 1941
4Conventional Hydroelectric125.0February 1944
5Conventional Hydroelectric125.0November 1943
6Conventional Hydroelectric125.0August 1943
7Conventional Hydroelectric125.0October 1947
8Conventional Hydroelectric125.0February 1943
9Conventional Hydroelectric125.0April 1948
10Conventional Hydroelectric125.0September 1951
11Conventional Hydroelectric125.0June 1951
12Conventional Hydroelectric125.0April 1951
13Conventional Hydroelectric125.0October 1950
14Conventional Hydroelectric125.0July 1950
15Conventional Hydroelectric125.0April 1950
16Conventional Hydroelectric125.0September 1949
17Conventional Hydroelectric125.0July 1949
18Conventional Hydroelectric125.0May 1949
19Conventional Hydroelectric600.0September 1975
20Conventional Hydroelectric600.0April 1976
21Conventional Hydroelectric600.0December 1976
22Conventional Hydroelectric805.0May 1978
23Conventional Hydroelectric805.0November 1979
24Conventional Hydroelectric805.0May 1980
LS1Conventional Hydroelectric10.0March 1941
LS2Conventional Hydroelectric10.0March 1941
LS3Conventional Hydroelectric10.0January 1951
PG7Hydroelectric Pumped Storage50.0October 1973
PG8Hydroelectric Pumped Storage50.0November 1973
PG9Hydroelectric Pumped Storage53.5April 1983
PG10Hydroelectric Pumped Storage53.5June 1983
PG11Hydroelectric Pumped Storage53.5November 1983
PG12Hydroelectric Pumped Storage53.5April 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Grand Coulee and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Grand Coulee

More plants operated by U S Bureau of Reclamation

Questions about Grand Coulee

How much power does Grand Coulee produce?

Grand Coulee reported 16,151,147 MWh (16.2 TWh) of net generation in 2025. From January to July 2026 it reported 12.8 TWh, which is provisional.

Where is Grand Coulee?

Grand Coulee is in Grant County, Washington, at 47.9575, −118.9773. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Grand Coulee?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Grand Coulee start operating?

Its first generator began operating in March 1941, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page