HydroOperatingBPAT

Chief Joseph

Hydro power plant in Douglas County, Washington. 1,743.8 MW of nameplate capacity across 19 generators, operated by USACE Northwestern Division.

Also known as Chief Joseph Powerhouse · EIA plant 3921

Analyst: free account, 1 question a day.

WellsChelanMain Canal HeadworksGrand CouleeChief Joseph25 km
Open in the map
4 plants within 50 km, from EIA coordinates.

Key facts

Capacity
1,743.8 MWNameplate
Generators
19 operatingEIA-860M, August 2026
Operating since
December 1956First generator online
Operator
USACE Northwestern DivisionEIA operator ID 19400
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Douglas County, WA47.9951, −119.6404
EIA plant ID
3921EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chief Joseph produces

Free · EIA-923

Net generation, 2025

9.81 TWh

9,806,156 MWh, final

Capacity factor, 2025

45.6%

2024: 42.8%

January to July 2026

8.02 TWh

Provisional

Range, 2015 to 2025

9.2–12.5

TWh a year. Low 2024, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200012,123,222Not reported12 of 12
20017,696,229Not reported12 of 12
200211,573,719Not reported12 of 12
200310,137,092Not reported12 of 12
200410,076,148Not reported12 of 12
200510,868,796Not reported12 of 12
200611,551,577Not reported12 of 12
200711,561,215Not reported12 of 12
200810,711,984Not reported12 of 12
20099,780,018Not reported12 of 12
20109,115,55642.4%12 of 12
201112,503,02958.1%12 of 12
201212,480,32757.8%12 of 12
201312,187,70256.6%12 of 12
201411,643,55954.1%12 of 12
201511,462,29653.3%12 of 12
201611,638,20653.9%12 of 12
201711,422,43353.1%12 of 12
201812,352,466Not reported12 of 12
20199,854,017Not reported12 of 12
202011,863,20355.0%12 of 12
202110,981,266Not reported12 of 12
202212,476,970Not reported12 of 12
20239,390,73643.6%12 of 12
20249,227,82842.8%12 of 12
20259,806,15645.6%12 of 12
2026 (provisional, partial year)8,015,32564.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric88.2October 1958
2Conventional Hydroelectric88.2July 1958
3Conventional Hydroelectric88.2May 1958
4Conventional Hydroelectric88.2February 1958
5Conventional Hydroelectric88.2February 1957
6Conventional Hydroelectric88.2December 1956
14Conventional Hydroelectric88.2July 1957
15Conventional Hydroelectric88.2September 1957
16Conventional Hydroelectric88.2November 1957
17Conventional Hydroelectric95.0July 1977
18Conventional Hydroelectric95.0August 1977
20Conventional Hydroelectric95.0June 1978
21Conventional Hydroelectric95.0June 1978
22Conventional Hydroelectric95.0June 1978
23Conventional Hydroelectric95.0September 1978
24Conventional Hydroelectric95.0January 1979
25Conventional Hydroelectric95.0January 1979
26Conventional Hydroelectric95.0February 1979
27Conventional Hydroelectric95.0May 1979

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists USACE Northwestern Division as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chief Joseph and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chief Joseph

More plants operated by USACE Northwestern Division

Questions about Chief Joseph

How much power does Chief Joseph produce?

Chief Joseph reported 9,806,156 MWh (9.81 TWh) of net generation in 2025, a 45.6% capacity factor on 1,743.8 MW of nameplate capacity. From January to July 2026 it reported 8.02 TWh, which is provisional.

Where is Chief Joseph?

Chief Joseph is in Douglas County, Washington, at 47.9951, −119.6404. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Chief Joseph?

EIA-860M for August 2026 lists USACE Northwestern Division as the operator (EIA operator ID 19400). The operator is not always the owner.

When did Chief Joseph start operating?

Its first generator began operating in December 1956, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page