HydroOperatingAVA

Main Canal Headworks

Hydro power plant in Grant County, Washington. 26.8 MW of nameplate capacity across 1 generator, operated by Columbia Basin Hydropower.

Also known as Dry Falls Dam · EIA plant 56698

Analyst: free account, 1 question a day.

Summer Falls Power PlantGrand CouleeChief JosephWellsChelanMain Canal Headworks25 km
Open in the map
5 plants within 59 km, from EIA coordinates.

Key facts

Capacity
26.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 1987First generator online
Operator
Columbia Basin HydropowerEIA operator ID 55939
Grid
AVABalancing authority AVA
Price nodes
None linkedNo verified ISO node
Location
Grant County, WA47.6164, −119.2992
EIA plant ID
56698EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Main Canal Headworks produces

Free · EIA-923

Net generation, 2025

105 GWh

105,240 MWh, final

Capacity factor, 2025

44.8%

2024: 43.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

85.8–107.3

GWh a year. Low 2019, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007100,204Not reported12 of 12
2008102,210Not reported12 of 12
2009102,905Not reported12 of 12
201095,62740.7%12 of 12
201180,40934.3%12 of 12
2012101,08042.9%12 of 12
2013102,22743.5%12 of 12
2014108,15846.1%12 of 12
201589,91538.3%12 of 12
201699,83242.4%12 of 12
201789,43338.1%12 of 12
201898,73542.1%12 of 12
201985,81136.6%12 of 12
202097,32241.3%12 of 12
2021107,29245.7%12 of 12
2022105,51944.9%12 of 12
2023103,60544.1%12 of 12
2024103,30643.9%12 of 12
2025105,24044.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric26.8January 1987

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Columbia Basin Hydropower as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Main Canal Headworks and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Main Canal Headworks

More plants operated by Columbia Basin Hydropower

Questions about Main Canal Headworks

How much power does Main Canal Headworks produce?

Main Canal Headworks reported 105,240 MWh (105 GWh) of net generation in 2025, a 44.8% capacity factor on 26.8 MW of nameplate capacity.

Where is Main Canal Headworks?

Main Canal Headworks is in Grant County, Washington, at 47.6164, −119.2992. It is in the Avista Corporation balancing area (AVA).

Who operates Main Canal Headworks?

EIA-860M for August 2026 lists Columbia Basin Hydropower as the operator (EIA operator ID 55939). The operator is not always the owner.

When did Main Canal Headworks start operating?

Its first generator began operating in January 1987, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page