HydroOperatingBPAT

McNary

Hydro power plant in Umatilla County, Oregon. 850.5 MW of nameplate capacity across 12 generators, operated by USACE Northwestern Division.

Also known as McNary Powerhouse · EIA plant 3084

Analyst: free account, 1 question a day.

NorWest Energy 9 LLCHermiston Generating…Hermiston Power PartnershipNine CanyonFour Corners Windfarm LLCMcNary10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
850.5 MWNameplate
Generators
12 operatingEIA-860M, August 2026
Operating since
December 1953First generator online
Operator
USACE Northwestern DivisionEIA operator ID 19400
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Umatilla County, OR45.9402, −119.2988
EIA plant ID
3084EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McNary produces

Free · EIA-923

Net generation, 2025

4.02 TWh

4,016,454 MWh, final

Capacity factor, 2025

46.3%

2024: 42.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

3.6–5.7

TWh a year. Low 2023, high 2017

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,073,380Not reported12 of 12
20014,788,083Not reported12 of 12
20025,877,293Not reported12 of 12
20035,754,077Not reported12 of 12
20045,679,791Not reported12 of 12
20054,876,821Not reported12 of 12
20065,611,495Not reported12 of 12
20075,356,361Not reported12 of 12
20085,186,107Not reported12 of 12
20095,092,866Not reported12 of 12
20104,599,71253.0%12 of 12
20115,850,69867.4%12 of 12
20125,803,55966.7%12 of 12
20135,270,31460.7%12 of 12
20145,364,54161.8%12 of 12
20155,150,30059.4%12 of 12
20165,627,63364.7%12 of 12
20175,709,42365.8%12 of 12
20185,682,145Not reported12 of 12
20194,474,35251.6%12 of 12
20204,996,98857.4%12 of 12
20214,336,640Not reported12 of 12
20224,640,05053.5%12 of 12
20233,645,54742.0%12 of 12
20243,668,28242.2%12 of 12
20254,016,45446.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric70.0December 1953
2Conventional Hydroelectric70.0January 1954
3Conventional Hydroelectric70.0May 1954
4Conventional Hydroelectric70.0July 1954
7Conventional Hydroelectric70.0March 1955
8Conventional Hydroelectric70.0June 1955
9Conventional Hydroelectric70.0September 1956
10Conventional Hydroelectric70.0November 1955
11Conventional Hydroelectric70.0May 1956
12Conventional Hydroelectric70.0May 1956
13Conventional Hydroelectric70.0March 1957
14Conventional Hydroelectric80.5March 1957

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists USACE Northwestern Division as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McNary and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McNary

More plants operated by USACE Northwestern Division

Questions about McNary

How much power does McNary produce?

McNary reported 4,016,454 MWh (4.02 TWh) of net generation in 2025, a 46.3% capacity factor on 850.5 MW of nameplate capacity.

Where is McNary?

McNary is in Umatilla County, Oregon, at 45.9402, −119.2988. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates McNary?

EIA-860M for August 2026 lists USACE Northwestern Division as the operator (EIA operator ID 19400). The operator is not always the owner.

When did McNary start operating?

Its first generator began operating in December 1953, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page