WindOperatingBPAT

Nine Canyon

Wind power plant in Benton County, Washington. 95.9 MW of nameplate capacity across 1 generator, operated by Energy Northwest.

Also known as Nine Canyon Wind Farm · Nine Canyon III · Nine Canyon II · EIA plant 7936

Analyst: free account, 1 question a day.

FPL Energy Vansycle LLC (WA)McNaryFPL Energy Vansycle LLC (OR)Ice HarborNorWest Energy 9 LLCNine Canyon10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
95.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2002First generator online
Operator
Energy NorthwestEIA operator ID 20160
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Benton County, WA46.0958, −119.0964
EIA plant ID
7936EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Nine Canyon produces

Free · EIA-923

Net generation, 2025

186 GWh

185,765 MWh, final

Capacity factor, 2025

22.1%

2024: 24.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

185.8–267.4

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200237,754Not reported7 of 12
2003124,300Not reported12 of 12
2004152,537Not reported12 of 12
2005147,348Not reported12 of 12
2006164,513Not reported12 of 12
2007162,716Not reported12 of 12
2008256,049Not reported12 of 12
2009233,636Not reported12 of 12
2010222,90326.5%12 of 12
2011266,63631.7%12 of 12
2012258,05330.6%12 of 12
2013224,89726.8%12 of 12
2014244,27329.1%12 of 12
2015211,20825.1%12 of 12
2016245,75929.2%12 of 12
2017212,78225.3%12 of 12
2018237,80128.3%12 of 12
2019196,56423.4%12 of 12
2020267,38231.7%12 of 12
2021243,64329.0%12 of 12
2022200,11023.8%12 of 12
2023194,73123.2%12 of 12
2024209,25824.8%12 of 12
2025185,76522.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine95.9September 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Energy Northwest as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Nine Canyon and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Nine Canyon

More plants operated by Energy Northwest

Questions about Nine Canyon

How much power does Nine Canyon produce?

Nine Canyon reported 185,765 MWh (186 GWh) of net generation in 2025, a 22.1% capacity factor on 95.9 MW of nameplate capacity.

Where is Nine Canyon?

Nine Canyon is in Benton County, Washington, at 46.0958, −119.0964. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Nine Canyon?

EIA-860M for August 2026 lists Energy Northwest as the operator (EIA operator ID 20160). The operator is not always the owner.

When did Nine Canyon start operating?

Its first generator began operating in September 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page