HydroOperatingAVA

Little Falls (WA)

Hydro power plant in Lincoln County, Washington. 43.2 MW of nameplate capacity across 4 generators, operated by Avista Corp.

Also known as EIA plant 3866

Analyst: free account, 1 question a day.

Long LakeNine MileSpokane Waste to EnergyMonroe StreetNortheast (WA)Little Falls (WA)25 km
Open in the map
6 plants within 42 km, from EIA coordinates.

Key facts

Capacity
43.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
July 1910First generator online
Operator
Avista CorpEIA operator ID 20169
Grid
AVABalancing authority AVA
Price nodes
None linkedNo verified ISO node
Location
Lincoln County, WA47.8217, −117.9167
EIA plant ID
3866EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Little Falls (WA) produces

Free · EIA-923

Net generation, 2025

189 GWh

188,764 MWh, final

Capacity factor, 2025

49.9%

2024: 48.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

147.6–212.5

GWh a year. Low 2015, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000207,491Not reported12 of 12
2001157,684Not reported12 of 12
2002204,960Not reported12 of 12
2003189,211Not reported12 of 12
2004211,820Not reported12 of 12
2005191,937Not reported12 of 12
2006222,692Not reported12 of 12
2007192,921Not reported12 of 12
2008204,514Not reported12 of 12
2009199,278Not reported12 of 12
2010200,46371.5%12 of 12
2011213,28476.1%12 of 12
2012201,98271.9%12 of 12
2013176,53963.0%12 of 12
2014195,00569.6%12 of 12
2015147,60252.7%12 of 12
2016182,385Not reported12 of 12
2017183,422Not reported12 of 12
2018166,423Not reported12 of 12
2019163,998Not reported12 of 12
2020212,53356.0%12 of 12
2021207,02254.7%12 of 12
2022206,04854.4%12 of 12
2023175,81146.5%12 of 12
2024185,33948.8%12 of 12
2025188,76449.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric10.8July 1910
2Conventional Hydroelectric10.8September 1910
3Conventional Hydroelectric10.8December 1910
4Conventional Hydroelectric10.8November 1911

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avista Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Little Falls (WA) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Little Falls (WA)

More plants operated by Avista Corp

Questions about Little Falls (WA)

How much power does Little Falls (WA) produce?

Little Falls (WA) reported 188,764 MWh (189 GWh) of net generation in 2025, a 49.9% capacity factor on 43.2 MW of nameplate capacity.

Where is Little Falls (WA)?

Little Falls (WA) is in Lincoln County, Washington, at 47.8217, −117.9167. It is in the Avista Corporation balancing area (AVA).

Who operates Little Falls (WA)?

EIA-860M for August 2026 lists Avista Corp as the operator (EIA operator ID 20169). The operator is not always the owner.

When did Little Falls (WA) start operating?

Its first generator began operating in July 1910, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page