Municipal solid wasteOperatingAVA

Spokane Waste to Energy

Municipal solid waste power plant in Spokane County, Washington. 26 MW of nameplate capacity across 1 generator, operated by City of Spokane - (WA).

Also known as Spokane Waste to Energy Plant · EIA plant 50886

Analyst: free account, 1 question a day.

Monroe StreetUpper FallsUpriver Dam Hydro PlantNortheast (WA)Nine MileSpokane Waste to Energy10 km
Open in the map
5 plants within 16 km, from EIA coordinates.

Key facts

Capacity
26 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1991First generator online
Operator
City of Spokane - (WA)EIA operator ID 42892
Grid
AVABalancing authority AVA
Price nodes
None linkedNo verified ISO node
Location
Spokane County, WA47.6263, −117.5042
EIA plant ID
50886EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Spokane Waste to Energy produces

Free · EIA-923

Net generation, 2025

135 GWh

134,535 MWh, final

Capacity factor, 2025

59.1%

2024: 58.0%

January to July 2026

77.5 GWh

Provisional

Range, 2015 to 2025

106.3–134.5

GWh a year. Low 2022, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001138,686Not reported12 of 12
2002145,952Not reported12 of 12
2003119,731Not reported11 of 12
2004148,587Not reported12 of 12
2005147,323Not reported12 of 12
2006141,330Not reported12 of 12
2007141,748Not reported12 of 12
2008128,131Not reported12 of 12
2009133,989Not reported12 of 12
2010141,49862.1%12 of 12
2011143,38363.0%12 of 12
2012140,29861.4%12 of 12
2013136,89260.1%12 of 12
2014132,72158.3%12 of 12
2015110,11848.3%12 of 12
2016122,48653.6%12 of 12
2017115,87550.9%12 of 12
2018123,28554.1%12 of 12
2019121,03153.1%12 of 12
2020125,28054.9%12 of 12
2021119,61952.5%12 of 12
2022106,27946.7%12 of 12
2023124,69354.7%12 of 12
2024132,37958.0%12 of 12
2025134,53559.1%12 of 12
2026 (provisional, partial year)77,48258.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Municipal Solid Waste26.0September 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Spokane - (WA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Spokane Waste to Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Spokane Waste to Energy

More plants operated by City of Spokane - (WA)

Questions about Spokane Waste to Energy

How much power does Spokane Waste to Energy produce?

Spokane Waste to Energy reported 134,535 MWh (135 GWh) of net generation in 2025, a 59.1% capacity factor on 26 MW of nameplate capacity. From January to July 2026 it reported 77.5 GWh, which is provisional.

Where is Spokane Waste to Energy?

Spokane Waste to Energy is in Spokane County, Washington, at 47.6263, −117.5042. It is in the Avista Corporation balancing area (AVA).

Who operates Spokane Waste to Energy?

EIA-860M for August 2026 lists City of Spokane - (WA) as the operator (EIA operator ID 42892). The operator is not always the owner.

When did Spokane Waste to Energy start operating?

Its first generator began operating in September 1991, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page