Natural gasOperatingBPAT

Coyote Springs II

Natural gas power plant in Morrow County, Oregon. 287 MW of nameplate capacity across 2 generators, operated by Avista Corp.

Also known as EIA plant 7931

Analyst: free account, 1 question a day.

Tower Solar, LLCFinley Buttes Landfill GasFour Corners Windfarm LLCHermiston Generating PlantCoyote Springs II10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
287 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2003First generator online
Operator
Avista CorpEIA operator ID 20169
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Morrow County, OR45.8480, −119.6740
EIA plant ID
7931EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Coyote Springs II produces

Free · EIA-923

Net generation, 2025

2.16 TWh

2,159,888 MWh, final

Capacity factor, 2025

85.9%

2024: 92.3%

January to July 2026

770 GWh

Provisional

Range, 2015 to 2025

1.5–2.3

TWh a year. Low 2018, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003714,581Not reported6 of 12
2004660,133Not reported12 of 12
20051,583,391Not reported12 of 12
20061,459,337Not reported12 of 12
20071,622,778Not reported12 of 12
20081,696,319Not reported12 of 12
20091,559,367Not reported12 of 12
20101,661,18266.1%12 of 12
2011705,06228.0%12 of 12
20121,142,11845.3%12 of 12
20131,796,280Not reported12 of 12
20141,493,93359.4%12 of 12
20151,891,95175.3%12 of 12
20161,765,406Not reported12 of 12
20171,659,029Not reported12 of 12
20181,495,19159.5%12 of 12
20191,890,01675.2%12 of 12
20201,767,33270.1%12 of 12
20211,533,63561.0%12 of 12
20221,844,24373.4%12 of 12
20232,263,06190.0%12 of 12
20242,325,85792.3%12 of 12
20252,159,88885.9%12 of 12
2026 (provisional, partial year)770,01352.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

896,162

US short tons. 2024: 958,944

SO₂, 2025

5

US short tons

NOx, 2025

95

US short tons

CO₂ per MWh, calculated

0.41 t

About 830 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (CTG2), matched to EIA plant 7931 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

574

million gallons

Consumption, 2024

470

million gallons

Source

Municipal

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.138

USGS SUI, HUC12 Whitcomb Island-Lake Umatilla

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combined Cycle170.0July 2003
2Natural Gas Fired Combined Cycle117.0July 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avista Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Coyote Springs II and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Coyote Springs II

More plants operated by Avista Corp

Questions about Coyote Springs II

How much power does Coyote Springs II produce?

Coyote Springs II reported 2,159,888 MWh (2.16 TWh) of net generation in 2025, a 85.9% capacity factor on 287 MW of nameplate capacity. From January to July 2026 it reported 770 GWh, which is provisional.

Where is Coyote Springs II?

Coyote Springs II is in Morrow County, Oregon, at 45.8480, −119.6740. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Coyote Springs II?

EIA-860M for August 2026 lists Avista Corp as the operator (EIA operator ID 20169). The operator is not always the owner.

When did Coyote Springs II start operating?

Its first generator began operating in July 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page