Long Lake
Hydro power plant in Lincoln County, Washington. 70 MW of nameplate capacity across 4 generators, operated by Avista Corp.
Also known as Long Lake Power Plant · EIA plant 3867
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 70 MWNameplate
- Generators
- 4 operatingEIA-860M, August 2026
- Operating since
- October 1915First generator online
- Operator
- Avista CorpEIA operator ID 20169
- Grid
- AVABalancing authority AVA
- Price nodes
- None linkedNo verified ISO node
- Location
- Lincoln County, WA47.8344, −117.8361
- EIA plant ID
- 3867EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Long Lake produces
Free · EIA-923Net generation, 2025
435 GWh
435,363 MWh, final
Capacity factor, 2025
71.0%
2024: 74.2%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
394.4–525.3
GWh a year. Low 2015, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 511,401 | Not reported | 12 of 12 |
| 2001 | 369,324 | Not reported | 12 of 12 |
| 2002 | 510,996 | Not reported | 12 of 12 |
| 2003 | 465,248 | Not reported | 12 of 12 |
| 2004 | 510,719 | Not reported | 12 of 12 |
| 2005 | 459,893 | Not reported | 12 of 12 |
| 2006 | 553,252 | Not reported | 12 of 12 |
| 2007 | 471,412 | Not reported | 12 of 12 |
| 2008 | 496,845 | Not reported | 12 of 12 |
| 2009 | 487,090 | Not reported | 12 of 12 |
| 2010 | 479,748 | 78.2% | 12 of 12 |
| 2011 | 555,565 | 90.6% | 12 of 12 |
| 2012 | 513,474 | 83.5% | 12 of 12 |
| 2013 | 504,779 | 82.3% | 12 of 12 |
| 2014 | 476,442 | 77.7% | 12 of 12 |
| 2015 | 394,390 | 64.3% | 12 of 12 |
| 2016 | 525,331 | 85.4% | 12 of 12 |
| 2017 | 508,341 | 82.9% | 12 of 12 |
| 2018 | 505,089 | 82.4% | 12 of 12 |
| 2019 | 438,456 | 71.5% | 12 of 12 |
| 2020 | 502,673 | 81.8% | 12 of 12 |
| 2021 | 478,013 | 78.0% | 12 of 12 |
| 2022 | 494,448 | 80.6% | 12 of 12 |
| 2023 | 412,958 | 67.3% | 12 of 12 |
| 2024 | 456,166 | 74.2% | 12 of 12 |
| 2025 | 435,363 | 71.0% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Conventional Hydroelectric | 17.5 | October 1915 |
| 2 | Conventional Hydroelectric | 17.5 | October 1915 |
| 3 | Conventional Hydroelectric | 17.5 | December 1919 |
| 4 | Conventional Hydroelectric | 17.5 | February 1924 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avista Corp as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Long Lake and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Long Lake
More plants operated by Avista Corp
Questions about Long Lake
How much power does Long Lake produce?
Long Lake reported 435,363 MWh (435 GWh) of net generation in 2025, a 71.0% capacity factor on 70 MW of nameplate capacity.
Where is Long Lake?
Long Lake is in Lincoln County, Washington, at 47.8344, −117.8361. It is in the Avista Corporation balancing area (AVA).
Who operates Long Lake?
EIA-860M for August 2026 lists Avista Corp as the operator (EIA operator ID 20169). The operator is not always the owner.
When did Long Lake start operating?
Its first generator began operating in October 1915, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page