Tower Solar, LLC
Solar power plant in Morrow County, Oregon. 120 MW of nameplate capacity across 1 generator, operated by Avangrid Power LLC.
Also known as EIA plant 68329
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 120 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2026First generator online
- Operator
- Avangrid Power LLCEIA operator ID 15399
- Grid
- BPATBalancing authority BPAT
- Price nodes
- None linkedNo verified ISO node
- Location
- Morrow County, OR45.8211, −119.7994
- EIA plant ID
- 68329EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Tower Solar produces
Free · EIA-923Net generation, 2025
Not reported
Not reported MWh, final. 0 of 12 months reported
Capacity factor, 2025
Not reported
2024: Not reported
January to July 2026
105 GWh
Provisional. 4 of 7 months reported
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | Not reported | Not reported | 0 of 12 |
| 2025 | Not reported | Not reported | 0 of 12 |
| 2026 (provisional, partial year) | 105,111 | Not reported | 4 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| TWS | Solar Photovoltaic | 120.0 | April 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Tower Solar, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Tower Solar
More plants operated by Avangrid Power LLC
Questions about Tower Solar
Where is Tower Solar, LLC?
Tower Solar, LLC is in Morrow County, Oregon, at 45.8211, −119.7994. It is in the Bonneville Power Administration balancing area (BPAT).
Who operates Tower Solar, LLC?
EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.
When did Tower Solar, LLC start operating?
Its first generator began operating in April 2026, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page