WindOperatingAVRN

Klondike Windpower III

Wind power plant in Sherman County, Oregon. 297.5 MW of nameplate capacity across 2 generators, operated by Avangrid Power LLC.

Also known as Klondike III · Klondike IIIA · EIA plant 56468

Analyst: free account, 1 question a day.

Klondike Wind PowerKlondike Windpower IIWyEast SolarStar Point Wind Project LLCHay Canyon Wind Power LLCPaTu Wind Farm LLCKlondike Windpower III5 km
Open in the map
6 plants within 9.4 km, from EIA coordinates.

Key facts

Capacity
297.5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2007First generator online
Operator
Avangrid Power LLCEIA operator ID 15399
Grid
AVRNBalancing authority AVRN
Price nodes
None linkedNo verified ISO node
Location
Sherman County, OR45.5836, −120.5042
EIA plant ID
56468EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Klondike Windpower III produces

Free · EIA-923

Net generation, 2025

707 GWh

706,799 MWh, final

Capacity factor, 2025

27.1%

2024: 28.0%

January to July 2026

466 GWh

Provisional

Range, 2015 to 2025

663.3–853.2

GWh a year. Low 2017, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
200789,171Not reported12 of 12
2008640,229Not reported12 of 12
2009766,642Not reported12 of 12
2010735,36428.2%12 of 12
2011821,81731.5%12 of 12
2012763,34929.2%12 of 12
2013814,90731.3%12 of 12
2014800,26030.7%12 of 12
2015726,91927.9%12 of 12
2016759,19629.1%12 of 12
2017663,33525.5%12 of 12
2018724,00427.8%12 of 12
2019699,88926.9%12 of 12
2020818,42031.3%12 of 12
2021853,18532.7%12 of 12
2022708,20827.2%12 of 12
2023683,99526.2%12 of 12
2024730,53028.0%12 of 12
2025706,79927.1%12 of 12
2026 (provisional, partial year)465,62330.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine221.0November 2007
2Onshore Wind Turbine76.5July 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Klondike Windpower III and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Klondike Windpower III

More plants operated by Avangrid Power LLC

Questions about Klondike Windpower III

How much power does Klondike Windpower III produce?

Klondike Windpower III reported 706,799 MWh (707 GWh) of net generation in 2025, a 27.1% capacity factor on 297.5 MW of nameplate capacity. From January to July 2026 it reported 466 GWh, which is provisional.

Where is Klondike Windpower III?

Klondike Windpower III is in Sherman County, Oregon, at 45.5836, −120.5042. It is in the Avangrid Renewables LLC balancing area (AVRN).

Who operates Klondike Windpower III?

EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.

When did Klondike Windpower III start operating?

Its first generator began operating in November 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page