WindOperatingBPAT

PaTu Wind Farm LLC

Wind power plant in Sherman County, Oregon. 9 MW of nameplate capacity across 1 generator, operated by PaTu Wind Farm LLC.

Also known as PaTu Wind Farm · EIA plant 57578

Analyst: free account, 1 question a day.

WyEast SolarBiglow Canyon Wind FarmKlondike Windpower IIKlondike Wind PowerGolden Hill WindPaTu Wind Farm5 km
Open in the map
6 plants within 9.4 km, from EIA coordinates.

Key facts

Capacity
9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2010First generator online
Operator
PaTu Wind Farm LLCEIA operator ID 56916
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Sherman County, OR45.6131, −120.6169
EIA plant ID
57578EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power PaTu Wind Farm produces

Free · EIA-923

Net generation, 2025

108 MWh

108 MWh, final

Capacity factor, 2025

0.1%

2024: 37.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.1–31.9

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
20101,069Not reported12 of 12
201130,69538.9%12 of 12
201228,44136.0%12 of 12
201330,94839.3%12 of 12
201430,29538.4%12 of 12
201527,53534.9%12 of 12
201628,85336.5%12 of 12
201724,51931.1%12 of 12
201827,92235.4%12 of 12
201926,32433.4%12 of 12
202031,85940.3%12 of 12
202130,20338.3%12 of 12
202225,69232.6%12 of 12
202325,51432.4%12 of 12
202429,86137.8%12 of 12
20251080.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PATUOnshore Wind Turbine9.0December 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PaTu Wind Farm LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query PaTu Wind Farm LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near PaTu Wind Farm

Questions about PaTu Wind Farm

How much power does PaTu Wind Farm LLC produce?

PaTu Wind Farm LLC reported 108 MWh (108 MWh) of net generation in 2025, a 0.1% capacity factor on 9 MW of nameplate capacity.

Where is PaTu Wind Farm LLC?

PaTu Wind Farm LLC is in Sherman County, Oregon, at 45.6131, −120.6169. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates PaTu Wind Farm LLC?

EIA-860M for August 2026 lists PaTu Wind Farm LLC as the operator (EIA operator ID 56916). The operator is not always the owner.

When did PaTu Wind Farm LLC start operating?

Its first generator began operating in December 2010, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page