Biglow Canyon Wind Farm

Wind power plant in Sherman County, Oregon. 449.7 MW of nameplate capacity across 3 generators, operated by Portland General Electric Co.

Also known as Biglow Canyon I · Biglow Canyon III · Biglow Canyon II · EIA plant 56485

Analyst: free account, 1 question a day.

PaTu Wind Farm LLCWyEast SolarKlondike Windpower IIJohn DayKlondike Wind PowerBiglow Canyon Wind Farm5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
449.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 2007First generator online
Operator
Portland General Electric CoEIA operator ID 15248
Grid
PGEBalancing authority PGE
Price nodes
3 CAISO nodesResource nodes with prices
Location
Sherman County, OR45.6537, −120.6034
EIA plant ID
56485EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Biglow Canyon Wind Farm produces

Free · EIA-923

Net generation, 2025

901 GWh

900,879 MWh, final

Capacity factor, 2025

22.9%

2024: 25.5%

January to July 2026

509 GWh

Provisional

Range, 2015 to 2025

0.8–1.2

TWh a year. Low 2022, high 2020

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
200711,400Not reported1 of 12
2008381,598Not reported12 of 12
2009343,833Not reported12 of 12
2010311,962Not reported12 of 12
2011486,28112.3%12 of 12
20121,108,51728.1%12 of 12
20131,190,81730.2%12 of 12
20141,142,48629.0%12 of 12
20151,045,25726.5%12 of 12
20161,058,132Not reported12 of 12
2017894,88122.7%12 of 12
20181,041,84026.4%12 of 12
2019983,16325.0%12 of 12
20201,152,08929.2%12 of 12
20211,116,24628.3%12 of 12
2022765,43519.4%12 of 12
2023934,53923.7%12 of 12
20241,005,85725.5%12 of 12
2025900,87922.9%12 of 12
2026 (provisional, partial year)508,69822.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine125.4December 2007
2Onshore Wind Turbine163.3September 2009
3Onshore Wind Turbine161.0August 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Portland General Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Biglow Canyon Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Biglow Canyon Wind Farm

More plants operated by Portland General Electric Co

Questions about Biglow Canyon Wind Farm

How much power does Biglow Canyon Wind Farm produce?

Biglow Canyon Wind Farm reported 900,879 MWh (901 GWh) of net generation in 2025, a 22.9% capacity factor on 449.7 MW of nameplate capacity. From January to July 2026 it reported 509 GWh, which is provisional.

Where is Biglow Canyon Wind Farm?

Biglow Canyon Wind Farm is in Sherman County, Oregon, at 45.6537, −120.6034. It is in the Portland General Electric Company balancing area (PGE).

Who operates Biglow Canyon Wind Farm?

EIA-860M for August 2026 lists Portland General Electric Co as the operator (EIA operator ID 15248). The operator is not always the owner.

When did Biglow Canyon Wind Farm start operating?

Its first generator began operating in December 2007, according to EIA-860M.

Does InfraMap have power prices for Biglow Canyon Wind Farm?

Yes. InfraMap has CAISO day-ahead and real-time prices at 3 price nodes linked to Biglow Canyon Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page