WindOperatingPGE

Tucannon River Wind Farm

Wind power plant in Columbia County, Washington. 266.8 MW of nameplate capacity across 1 generator, operated by Portland General Electric Co.

Also known as Tucannon River · EIA plant 58571

Analyst: free account, 1 question a day.

Hopkins Ridge WindLittle GooseLower Snake River Wind Energy ProjectMarengo Wind PlantTwin ReservoirsLower MonumentalTucannon River Wind F…25 km
Open in the map
6 plants within 42 km, from EIA coordinates.

Key facts

Capacity
266.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2014First generator online
Operator
Portland General Electric CoEIA operator ID 15248
Grid
PGEBalancing authority PGE
Price nodes
None linkedNo verified ISO node
Location
Columbia County, WA46.4211, −118.0269
EIA plant ID
58571EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tucannon River Wind Farm produces

Free · EIA-923

Net generation, 2025

737 GWh

736,786 MWh, final

Capacity factor, 2025

31.5%

2024: 34.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

678.5–941.7

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015758,19732.4%12 of 12
2016869,35137.1%12 of 12
2017710,12930.4%12 of 12
2018843,71636.1%12 of 12
2019723,46731.0%12 of 12
2020941,73140.2%12 of 12
2021866,06537.1%12 of 12
2022738,13931.6%12 of 12
2023678,45929.0%12 of 12
2024808,34634.5%12 of 12
2025736,78631.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine266.8December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Portland General Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tucannon River Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tucannon River Wind Farm

More plants operated by Portland General Electric Co

Questions about Tucannon River Wind Farm

How much power does Tucannon River Wind Farm produce?

Tucannon River Wind Farm reported 736,786 MWh (737 GWh) of net generation in 2025, a 31.5% capacity factor on 266.8 MW of nameplate capacity.

Where is Tucannon River Wind Farm?

Tucannon River Wind Farm is in Columbia County, Washington, at 46.4211, −118.0269. It is in the Portland General Electric Company balancing area (PGE).

Who operates Tucannon River Wind Farm?

EIA-860M for August 2026 lists Portland General Electric Co as the operator (EIA operator ID 15248). The operator is not always the owner.

When did Tucannon River Wind Farm start operating?

Its first generator began operating in December 2014, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page