WindOperatingBPAT

Hopkins Ridge Wind

Wind power plant in Columbia County, Washington. 156.6 MW of nameplate capacity across 2 generators, operated by Puget Sound Energy Inc.

Also known as Hopkins Ridge Wind Project · Hopkins Ridge II · EIA plant 56255

Analyst: free account, 1 question a day.

Marengo Wind PlantLower Snake River Wind Energy ProjectTucannon River Wind F…Little GooseLower GraniteTwin ReservoirsHopkins Ridge Wind25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
156.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2005First generator online
Operator
Puget Sound Energy IncEIA operator ID 15500
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Columbia County, WA46.4211, −117.8331
EIA plant ID
56255EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hopkins Ridge Wind produces

Free · EIA-923

Net generation, 2025

345 GWh

345,386 MWh, final

Capacity factor, 2025

25.2%

2024: 29.7%

January to July 2026

230 GWh

Provisional

Range, 2015 to 2025

326.0–416.1

GWh a year. Low 2023, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006361,584Not reported12 of 12
2007402,465Not reported12 of 12
2008434,100Not reported12 of 12
2009379,078Not reported12 of 12
2010379,31027.5%12 of 12
2011432,84531.4%12 of 12
2012426,35530.9%12 of 12
2013404,140Not reported12 of 12
2014453,21933.0%12 of 12
2015362,25326.4%12 of 12
2016415,07030.2%12 of 12
2017342,81025.0%12 of 12
2018408,65829.8%12 of 12
2019337,99324.6%12 of 12
2020414,67332.9%11 of 12
2021416,13830.3%12 of 12
2022348,57725.4%12 of 12
2023326,03123.8%12 of 12
2024408,57129.7%12 of 12
2025345,38625.2%12 of 12
2026 (provisional, partial year)230,26828.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine149.4November 2005
2Onshore Wind Turbine7.2August 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Puget Sound Energy Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hopkins Ridge Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hopkins Ridge Wind

More plants operated by Puget Sound Energy Inc

Questions about Hopkins Ridge Wind

How much power does Hopkins Ridge Wind produce?

Hopkins Ridge Wind reported 345,386 MWh (345 GWh) of net generation in 2025, a 25.2% capacity factor on 156.6 MW of nameplate capacity. From January to July 2026 it reported 230 GWh, which is provisional.

Where is Hopkins Ridge Wind?

Hopkins Ridge Wind is in Columbia County, Washington, at 46.4211, −117.8331. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Hopkins Ridge Wind?

EIA-860M for August 2026 lists Puget Sound Energy Inc as the operator (EIA operator ID 15500). The operator is not always the owner.

When did Hopkins Ridge Wind start operating?

Its first generator began operating in November 2005, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page