Wood biomassOperatingSOCO

Leaf River Cellulose LLC

Wood biomass power plant in Perry County, Mississippi. 50.4 MW of nameplate capacity across 2 generators, operated by Leaf River Cellulose LLC.

Also known as Leaf River Cellulose Cogeneration · EIA plant 10233

Analyst: free account, 1 question a day.

R D MorrowMoselleSumrall II Solar FarmBenndaleLeaf River Cellulose25 km
Open in the map
6 plants within 46 km, from EIA coordinates.

Key facts

Capacity
50.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1984First generator online
Operator
Leaf River Cellulose LLCEIA operator ID 50133
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Perry County, MS31.2434, −89.0456
EIA plant ID
10233EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Leaf River Cellulose produces

Free · EIA-923

Net generation, 2025

418 GWh

418,130 MWh, final

Capacity factor, 2025

94.7%

2024: 97.8%

January to July 2026

249 GWh

Provisional

Range, 2015 to 2025

383.5–436.5

GWh a year. Low 2018, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000431,155Not reported12 of 12
2001239,137Not reported7 of 12
20020Not reported4 of 12
20030Not reported12 of 12
2004428,159Not reported12 of 12
2005405,612Not reported12 of 12
2006416,280Not reported12 of 12
2007410,572Not reported12 of 12
2008389,970Not reported12 of 12
2009410,824Not reported12 of 12
2010413,91094.5%12 of 12
2011439,075100.2%12 of 12
2012438,233Not reported12 of 12
2013435,538Not reported12 of 12
2014147,233101.4%4 of 12
2015419,70995.1%12 of 12
2016430,20197.2%12 of 12
2017396,26589.8%12 of 12
2018383,53486.9%12 of 12
2019403,44191.4%12 of 12
2020408,40292.2%12 of 12
2021436,47698.9%12 of 12
2022425,78596.4%12 of 12
2023421,18095.4%12 of 12
2024432,82597.8%12 of 12
2025418,13094.7%12 of 12
2026 (provisional, partial year)249,23697.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Wood/Wood Waste Biomass25.2July 1984
GEN2Wood/Wood Waste Biomass25.2July 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Leaf River Cellulose LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Leaf River Cellulose LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Leaf River Cellulose

Questions about Leaf River Cellulose

How much power does Leaf River Cellulose LLC produce?

Leaf River Cellulose LLC reported 418,130 MWh (418 GWh) of net generation in 2025, a 94.7% capacity factor on 50.4 MW of nameplate capacity. From January to July 2026 it reported 249 GWh, which is provisional.

Where is Leaf River Cellulose LLC?

Leaf River Cellulose LLC is in Perry County, Mississippi, at 31.2434, −89.0456. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Leaf River Cellulose LLC?

EIA-860M for August 2026 lists Leaf River Cellulose LLC as the operator (EIA operator ID 50133). The operator is not always the owner.

When did Leaf River Cellulose LLC start operating?

Its first generator began operating in July 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page