Natural gasOperatingMISO

R D Morrow

Natural gas power plant in Lamar County, Mississippi. 558 MW of nameplate capacity across 2 generators, operated by Cooperative Energy.

Also known as Morrow Power Plant · R.D. Morrow · RD Morrow · EIA plant 6061

Analyst: free account, 1 question a day.

Hattiesburg Solar FarmSumrall II Solar FarmSumrall I Solar FarmMoselleR D Morrow20 km
Open in the map
5 plants within 36 km, from EIA coordinates.

Key facts

Capacity
558 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
March 2023First generator online
Operator
Cooperative EnergyEIA operator ID 17568
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Lamar County, MS31.2186, −89.3940
EIA plant ID
6061EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power R D Morrow produces

Free · EIA-923

Net generation, 2025

2.81 TWh

2,805,424 MWh, final

Capacity factor, 2025

57.4%

2024: 54.6%

January to July 2026

1.83 TWh

Provisional

Range, 2015 to 2025

0.1–2.8

TWh a year. Low 2017, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,404,639Not reported12 of 12
20012,154,027Not reported12 of 12
20022,329,127Not reported12 of 12
20032,642,506Not reported12 of 12
20042,538,048Not reported12 of 12
20052,551,303Not reported12 of 12
20062,636,912Not reported12 of 12
20072,679,476Not reported12 of 12
20082,545,825Not reported12 of 12
20091,903,255Not reported12 of 12
20102,230,54963.7%12 of 12
20111,480,88646.0%11 of 12
20121,070,66530.5%12 of 12
2013991,11828.3%12 of 12
2014764,20121.8%12 of 12
2015245,8547.0%12 of 12
2016391,73211.1%12 of 12
201795,1492.7%12 of 12
2018119,330Not reported12 of 12
20190Not reported2 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
20232,859,54777.6%9 of 12
20242,677,70554.6%12 of 12
20252,805,42457.4%12 of 12
2026 (provisional, partial year)1,831,96864.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2017

119,835

US short tons. 2016: 489,765

SO₂, 2017

16

US short tons

NOx, 2017

229

US short tons

CO₂ per MWh, calculated

1.26 t

About 2,519 lb per MWh

2 of 2 EPA units reported CO₂ in 2017 (1, 2), matched to EIA plant 6061 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MOR1Natural Gas Fired Combined Cycle156.0March 2023
MOR2Natural Gas Fired Combined Cycle402.0March 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cooperative Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query R D Morrow and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near R D Morrow

More plants operated by Cooperative Energy

Questions about R D Morrow

How much power does R D Morrow produce?

R D Morrow reported 2,805,424 MWh (2.81 TWh) of net generation in 2025, a 57.4% capacity factor on 558 MW of nameplate capacity. From January to July 2026 it reported 1.83 TWh, which is provisional.

Where is R D Morrow?

R D Morrow is in Lamar County, Mississippi, at 31.2186, −89.3940. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates R D Morrow?

EIA-860M for August 2026 lists Cooperative Energy as the operator (EIA operator ID 17568). The operator is not always the owner.

When did R D Morrow start operating?

Its first generator began operating in March 2023, according to EIA-860M.

Does InfraMap have power prices for R D Morrow?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to R D Morrow, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page