Natural gasOperatingCAISO

King City Power Plant

Natural gas power plant in Monterey County, California. 133.2 MW of nameplate capacity across 2 generators, operated by Calpine King City Cogen LLC.

Also known as EIA plant 10294

Analyst: free account, 1 question a day.

Foundation Scheid VineyardsBlackjack SolarCity of Soledad Water ReclamationFoundation Dole Fresh VegetablesKing City20 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
133.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
February 1989First generator online
Operator
Calpine King City Cogen LLCEIA operator ID 2938
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Monterey County, CA36.2250, −121.1278
EIA plant ID
10294EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power King City produces

Free · EIA-923

Net generation, 2025

24.3 GWh

24,287 MWh, final

Capacity factor, 2025

2.1%

2024: 3.2%

January to July 2026

12.3 GWh

Provisional

Range, 2015 to 2025

24.3–441.6

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000915,342Not reported12 of 12
2001867,669Not reported12 of 12
2002999,254Not reported12 of 12
2003899,029Not reported11 of 12
2004899,881Not reported12 of 12
2005783,064Not reported12 of 12
2006767,682Not reported12 of 12
2007396,520Not reported12 of 12
2008478,426Not reported12 of 12
2009623,584Not reported12 of 12
2010589,76250.5%12 of 12
2011599,74751.4%12 of 12
2012501,22942.8%12 of 12
2013409,742Not reported12 of 12
2014511,78743.9%12 of 12
2015441,61337.8%12 of 12
2016419,18835.8%12 of 12
2017383,37532.9%12 of 12
2018374,69332.1%12 of 12
2019161,44713.8%12 of 12
202061,5525.3%12 of 12
202184,0817.2%12 of 12
202260,0725.1%12 of 12
202356,3814.8%12 of 12
202437,9533.2%12 of 12
202524,2872.1%12 of 12
2026 (provisional, partial year)12,2761.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

12,782

US short tons. 2024: 20,242

SO₂, 2025

0

US short tons

NOx, 2025

6

US short tons

CO₂ per MWh, calculated

0.53 t

About 1,053 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GTG), matched to EIA plant 10294 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GTGNatural Gas Fired Combined Cycle90.8February 1989
STGNatural Gas Fired Combined Cycle42.4March 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine King City Cogen LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query King City Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near King City

Questions about King City

How much power does King City Power Plant produce?

King City Power Plant reported 24,287 MWh (24.3 GWh) of net generation in 2025, a 2.1% capacity factor on 133.2 MW of nameplate capacity. From January to July 2026 it reported 12.3 GWh, which is provisional.

Where is King City Power Plant?

King City Power Plant is in Monterey County, California, at 36.2250, −121.1278. It is in the California Independent System Operator balancing area (CISO).

Who operates King City Power Plant?

EIA-860M for August 2026 lists Calpine King City Cogen LLC as the operator (EIA operator ID 2938). The operator is not always the owner.

When did King City Power Plant start operating?

Its first generator began operating in February 1989, according to EIA-860M.

Does InfraMap have power prices for King City Power Plant?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to King City Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page