Natural gasOperatingNYISO

Carthage Energy LLC

Natural gas power plant in Jefferson County, New York. 62.9 MW of nameplate capacity across 2 generators, operated by Carthage Energy LLC.

Also known as Carthage Energy LLC Power Plant · EIA plant 10620

Analyst: free account, 1 question a day.

Longfalls FacilityTannery Island PowerCarthage BNY 26 Carthage CSGCarthage ACarthage Energy2 km
Open in the map
6 plants within 3.6 km, from EIA coordinates.

Key facts

Capacity
62.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 1991First generator online
Operator
Carthage Energy LLCEIA operator ID 3085
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Jefferson County, NY43.9842, −75.6225
EIA plant ID
10620EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Carthage Energy produces

Free · EIA-923

Net generation, 2025

6.66 GWh

6,660 MWh, final

Capacity factor, 2025

1.2%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.3–19.9

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200075,331Not reported12 of 12
200173,948Not reported12 of 12
200279,212Not reported12 of 12
20034,836Not reported2 of 12
20045,731Not reported12 of 12
200512,508Not reported12 of 12
200611,838Not reported12 of 12
200725,111Not reported12 of 12
20084,793Not reported12 of 12
20094,755Not reported12 of 12
201012,4272.3%12 of 12
20116,7551.2%12 of 12
201224,4154.4%12 of 12
20133,097Not reported12 of 12
201411,4172.1%12 of 12
201510,0621.8%12 of 12
201610,3971.9%12 of 12
20174,9010.9%12 of 12
201819,9423.6%12 of 12
20193,1630.6%12 of 12
20204,6270.8%12 of 12
20214,9200.9%12 of 12
20222,7630.5%12 of 12
20232,2560.4%12 of 12
20243,2830.6%12 of 12
20256,6601.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

3,732

US short tons. 2024: 1,821

SO₂, 2025

0

US short tons

NOx, 2025

6

US short tons

CO₂ per MWh, calculated

0.56 t

About 1,121 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 10620 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle40.9November 1991
GEN2Natural Gas Fired Combined Cycle22.0November 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Carthage Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Carthage Energy LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Carthage Energy

Questions about Carthage Energy

How much power does Carthage Energy LLC produce?

Carthage Energy LLC reported 6,660 MWh (6.66 GWh) of net generation in 2025, a 1.2% capacity factor on 62.9 MW of nameplate capacity.

Where is Carthage Energy LLC?

Carthage Energy LLC is in Jefferson County, New York, at 43.9842, −75.6225. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Carthage Energy LLC?

EIA-860M for August 2026 lists Carthage Energy LLC as the operator (EIA operator ID 3085). The operator is not always the owner.

When did Carthage Energy LLC start operating?

Its first generator began operating in November 1991, according to EIA-860M.

Does InfraMap have power prices for Carthage Energy LLC?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to Carthage Energy LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page