Natural gasOperatingNYISO

Selkirk Cogen

Natural gas power plant in Albany County, New York. 434 MW of nameplate capacity across 4 generators, operated by Selkirk Cogen Partners LP.

Also known as Selkirk Cogen Partners · EIA plant 10725

Analyst: free account, 1 question a day.

Owens Corning at BethlehemNY Selkirk S Albany RD - Hemlock Hills SBethlehem SolarBethlehem - EastBethlehem - WestBethlehemSelkirk Cogen2 km
Open in the map
6 plants within 5.7 km, from EIA coordinates.

Key facts

Capacity
434 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
April 1992First generator online
Operator
Selkirk Cogen Partners LPEIA operator ID 16909
Grid
NYISOBalancing authority NYIS
Price nodes
2 NYISO nodesResource nodes with prices
Location
Albany County, NY42.5744, −73.8592
EIA plant ID
10725EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Selkirk Cogen produces

Free · EIA-923

Net generation, 2025

346 GWh

346,366 MWh, final

Capacity factor, 2025

8.9%

2024: 2.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.1–1.1

TWh a year. Low 2024, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,464,363Not reported12 of 12
20012,555,010Not reported12 of 12
20022,545,706Not reported12 of 12
20032,724,645Not reported12 of 12
20042,546,947Not reported12 of 12
20052,329,687Not reported12 of 12
20061,935,383Not reported12 of 12
20071,859,839Not reported12 of 12
20081,242,087Not reported7 of 12
20091,779,871Not reported12 of 12
20101,689,73543.2%12 of 12
20111,994,34151.0%12 of 12
20121,664,98342.5%12 of 12
20131,969,74450.4%12 of 12
2014470,35717.9%8 of 12
20151,107,35828.3%12 of 12
2016621,94315.9%12 of 12
2017212,5855.4%12 of 12
2018399,66210.2%12 of 12
2019118,6493.0%12 of 12
2020134,276Not reported12 of 12
2021102,6092.6%12 of 12
2022339,2468.7%12 of 12
2023Not reportedNot reported0 of 12
202492,3612.4%12 of 12
2025346,3668.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

183,106

US short tons. 2024: 52,545

SO₂, 2025

1

US short tons

NOx, 2025

67

US short tons

CO₂ per MWh, calculated

0.53 t

About 1,057 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (CTG101, CTG201, CTG301), matched to EIA plant 10725 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

29

million gallons

Consumption, 2024

29

million gallons

Source

Municipal

Other, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.159

USGS SUI, HUC12 Onesquethaw Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle95.2April 1992
GEN3Natural Gas Fired Combined Cycle95.2April 1994
GEN4Natural Gas Fired Combined Cycle95.2April 1994
GEN5Natural Gas Fired Combined Cycle148.4April 1994

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Selkirk Cogen Partners LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Selkirk Cogen and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Selkirk Cogen

Questions about Selkirk Cogen

How much power does Selkirk Cogen produce?

Selkirk Cogen reported 346,366 MWh (346 GWh) of net generation in 2025, a 8.9% capacity factor on 434 MW of nameplate capacity.

Where is Selkirk Cogen?

Selkirk Cogen is in Albany County, New York, at 42.5744, −73.8592. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Selkirk Cogen?

EIA-860M for August 2026 lists Selkirk Cogen Partners LP as the operator (EIA operator ID 16909). The operator is not always the owner.

When did Selkirk Cogen start operating?

Its first generator began operating in April 1992, according to EIA-860M.

Does InfraMap have power prices for Selkirk Cogen?

Yes. InfraMap has NYISO day-ahead and real-time prices at 2 price nodes linked to Selkirk Cogen, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page