Fries Hydroelectric Project

Hydro power plant in Grayson County, Virginia. 5.4 MW of nameplate capacity across 4 generators, operated by Central Rivers Power US, LLC.

Also known as EIA plant 10798

Analyst: free account, 1 question a day.

River Trail Solar, LLCByllesby 2Buck HydroWythe County SolarCaden Energix Wytheville LLCFries Hydroelectric P…10 km
Open in the map
5 plants within 28 km, from EIA coordinates.

Key facts

Capacity
5.4 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
January 1933First generator online
Operator
Central Rivers Power US, LLCEIA operator ID 64078
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Grayson County, VA36.7151, −80.9856
EIA plant ID
10798EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fries Hydroelectric Project produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 37.7%

January to July 2026

0 MWh

Provisional

Range, 2015 to 2025

0.0–26.8

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200116,974Not reported12 of 12
20024,439Not reported12 of 12
200333,911Not reported12 of 12
200431,434Not reported12 of 12
200526,801Not reported12 of 12
200624,891Not reported12 of 12
200717,185Not reported12 of 12
200818,578Not reported12 of 12
200929,628Not reported12 of 12
201020,93544.3%12 of 12
201126,11955.2%12 of 12
201227,01356.9%12 of 12
201333,30670.4%12 of 12
201426,28155.6%12 of 12
201526,78456.6%12 of 12
201622,26646.9%12 of 12
201723,44949.6%12 of 12
201825,68154.3%12 of 12
201912,52426.5%12 of 12
202010,56322.3%12 of 12
202117,90737.9%12 of 12
202218,38538.9%12 of 12
202319,48941.2%12 of 12
202417,87037.7%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)00.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric2.0January 1933
GEN2Conventional Hydroelectric0.8January 1933
GEN3Conventional Hydroelectric0.2January 1933
GEN4Conventional Hydroelectric2.4January 1981

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Central Rivers Power US, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fries Hydroelectric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fries Hydroelectric Project

More plants operated by Central Rivers Power US, LLC

Questions about Fries Hydroelectric Project

How much power does Fries Hydroelectric Project produce?

Fries Hydroelectric Project reported 0 MWh (0 MWh) of net generation in 2025. From January to July 2026 it reported 0 MWh, which is provisional.

Where is Fries Hydroelectric Project?

Fries Hydroelectric Project is in Grayson County, Virginia, at 36.7151, −80.9856. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Fries Hydroelectric Project?

EIA-860M for August 2026 lists Central Rivers Power US, LLC as the operator (EIA operator ID 64078). The operator is not always the owner.

When did Fries Hydroelectric Project start operating?

Its first generator began operating in January 1933, according to EIA-860M.

Does InfraMap have power prices for Fries Hydroelectric Project?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Fries Hydroelectric Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page