Natural gasOperatingMISO

Gas Turbine (IA)

Natural gas power plant in Black Hawk County, Iowa. 43.4 MW of nameplate capacity across 2 generators, operated by Cedar Falls Utilities.

Also known as Cedar Falls Utilities Gas Turbine · EIA plant 1130

Analyst: free account, 1 question a day.

University of Northern IowaStreeter StationCedar Falls Solar FarmElectrifarmWaterloo Solar (IA)Gas Turbine (IA)5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
43.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1968First generator online
Operator
Cedar Falls UtilitiesEIA operator ID 3203
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Black Hawk County, IA42.5120, −92.4760
EIA plant ID
1130EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gas Turbine (IA) produces

Free · EIA-923

Net generation, 2025

1.06 GWh

1,056 MWh, final

Capacity factor, 2025

0.3%

2024: 0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.5–1.1

GWh a year. Low 2019, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,206Not reported12 of 12
20011,030Not reported12 of 12
2002−236Not reported12 of 12
2003−401Not reported12 of 12
2004−513Not reported12 of 12
2005−513Not reported12 of 12
200671Not reported12 of 12
2007−573Not reported12 of 12
2008−359Not reported12 of 12
2009−466Not reported12 of 12
2010−94-0.0%12 of 12
20111,877Not reported12 of 12
20123,4420.9%12 of 12
20138700.2%12 of 12
20149670.3%12 of 12
20154470.1%12 of 12
2016−100-0.0%12 of 12
2017−321-0.1%12 of 12
2018−410-0.1%12 of 12
2019−471-0.1%12 of 12
2020−376-0.1%12 of 12
20212450.1%12 of 12
20226070.2%12 of 12
2023−223-0.1%12 of 12
20246900.2%12 of 12
20251,0560.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine19.6January 1968
2Natural Gas Fired Combustion Turbine23.8September 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cedar Falls Utilities as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gas Turbine (IA) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gas Turbine (IA)

More plants operated by Cedar Falls Utilities

Questions about Gas Turbine (IA)

How much power does Gas Turbine (IA) produce?

Gas Turbine (IA) reported 1,056 MWh (1.06 GWh) of net generation in 2025, a 0.3% capacity factor on 43.4 MW of nameplate capacity.

Where is Gas Turbine (IA)?

Gas Turbine (IA) is in Black Hawk County, Iowa, at 42.5120, −92.4760. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Gas Turbine (IA)?

EIA-860M for August 2026 lists Cedar Falls Utilities as the operator (EIA operator ID 3203). The operator is not always the owner.

When did Gas Turbine (IA) start operating?

Its first generator began operating in January 1968, according to EIA-860M.

Does InfraMap have power prices for Gas Turbine (IA)?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Gas Turbine (IA), with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page