Natural gasOperatingSPP

Great Bend - Sunflower

Natural gas power plant in Barton County, Kansas. 81.6 MW of nameplate capacity across 1 generator, operated by Sunflower Electric Power Corp.

Also known as Great Bend 3 · EIA plant 1235

Analyst: free account, 1 question a day.

HoisingtonEllinwoodLarnedLa CrosseSt JohnRussell DowntownGreat Bend - Sunflower25 km
Open in the map
6 plants within 54 km, from EIA coordinates.

Key facts

Capacity
81.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 1963First generator online
Operator
Sunflower Electric Power CorpEIA operator ID 18315
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Barton County, KS38.4100, −98.8689
EIA plant ID
1235EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Great Bend - Sunflower produces

Free · EIA-923

Net generation, 2025

19.8 GWh

19,800 MWh, final

Capacity factor, 2025

2.8%

2024: 7.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−1.0–51.9

GWh a year. Low 2021, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000216,503Not reported12 of 12
200163,132Not reported12 of 12
200298,816Not reported12 of 12
200393,944Not reported12 of 12
200476,202Not reported12 of 12
2005120,282Not reported12 of 12
2006107,318Not reported12 of 12
2007−398Not reported2 of 12
2008135,451Not reported12 of 12
2009142,599Not reported12 of 12
201099,12613.9%12 of 12
201173,76610.3%12 of 12
2012140,66519.6%12 of 12
2013104,69414.6%12 of 12
20144,7390.7%12 of 12
2015−775-0.1%12 of 12
2016−175-0.0%12 of 12
20173590.1%12 of 12
2018−661-0.1%12 of 12
20193240.0%12 of 12
2020−436-0.1%12 of 12
2021−1,045-0.1%12 of 12
202217,2632.4%12 of 12
202331,9764.5%12 of 12
202451,8777.2%12 of 12
202519,8002.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

17,234

US short tons. 2024: 39,661

SO₂, 2025

0

US short tons

NOx, 2025

19

US short tons

CO₂ per MWh, calculated

0.87 t

About 1,741 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (3), matched to EIA plant 1235 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Natural Gas Steam Turbine81.6June 1963

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sunflower Electric Power Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Great Bend - Sunflower and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Great Bend - Sunflower

More plants operated by Sunflower Electric Power Corp

Questions about Great Bend - Sunflower

How much power does Great Bend - Sunflower produce?

Great Bend - Sunflower reported 19,800 MWh (19.8 GWh) of net generation in 2025, a 2.8% capacity factor on 81.6 MW of nameplate capacity.

Where is Great Bend - Sunflower?

Great Bend - Sunflower is in Barton County, Kansas, at 38.4100, −98.8689. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Great Bend - Sunflower?

EIA-860M for August 2026 lists Sunflower Electric Power Corp as the operator (EIA operator ID 18315). The operator is not always the owner.

When did Great Bend - Sunflower start operating?

Its first generator began operating in June 1963, according to EIA-860M.

Does InfraMap have power prices for Great Bend - Sunflower?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Great Bend - Sunflower, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page