OilOperatingSPP

Quindaro

Oil power plant in Wyandotte County, Kansas. 143.6 MW of nameplate capacity across 2 generators, operated by City of Kansas City - (KS).

Also known as EIA plant 1295

Analyst: free account, 1 question a day.

BPU Solar FarmNearman CreekGrand Ave PlantNortheast (MO)HawthornQuindaro5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
143.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1974First generator online
Operator
City of Kansas City - (KS)EIA operator ID 9996
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Wyandotte County, KS39.1492, −94.6381
EIA plant ID
1295EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Quindaro produces

Free · EIA-923

Net generation, 2025

7.76 GWh

7,760 MWh, final

Capacity factor, 2025

0.6%

2024: 0.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−1.7–316.5

GWh a year. Low 2019, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000856,354Not reported12 of 12
2001827,995Not reported12 of 12
2002967,947Not reported12 of 12
2003613,716Not reported7 of 12
2004965,959Not reported12 of 12
20051,002,799Not reported12 of 12
20061,079,973Not reported12 of 12
20071,179,126Not reported12 of 12
20081,068,235Not reported12 of 12
20091,103,686Not reported12 of 12
20101,079,47631.7%12 of 12
2011947,00127.8%12 of 12
2012894,48726.2%12 of 12
2013820,40924.1%12 of 12
20141,072,45631.5%12 of 12
2015316,478Not reported12 of 12
2016Not reportedNot reported0 of 12
20179,7250.3%12 of 12
201827,4970.8%12 of 12
2019−1,687Not reported12 of 12
20203,0810.1%12 of 12
202110,6020.3%12 of 12
20229,525Not reported12 of 12
20236,1520.2%12 of 12
202410,4470.3%12 of 12
20257,7600.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

0

US short tons

NOx, 2025

106

US short tons

0 of 2 EPA units reported CO₂ in 2025 (1, 2, CT2, CT3), matched to EIA plant 1295 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT2Petroleum Liquids72.4July 1974
GT3Petroleum Liquids71.2August 1977

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Kansas City - (KS) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Quindaro and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Quindaro

More plants operated by City of Kansas City - (KS)

Questions about Quindaro

How much power does Quindaro produce?

Quindaro reported 7,760 MWh (7.76 GWh) of net generation in 2025, a 0.6% capacity factor on 143.6 MW of nameplate capacity.

Where is Quindaro?

Quindaro is in Wyandotte County, Kansas, at 39.1492, −94.6381. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Quindaro?

EIA-860M for August 2026 lists City of Kansas City - (KS) as the operator (EIA operator ID 9996). The operator is not always the owner.

When did Quindaro start operating?

Its first generator began operating in July 1974, according to EIA-860M.

Does InfraMap have power prices for Quindaro?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Quindaro, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page