OilOperatingSPP

Northeast (MO)

Oil power plant in Jackson County, Missouri. 540 MW of nameplate capacity across 9 generators, operated by Evergy Metro.

Also known as Evergy Northeast Power Plant · EIA plant 2081

Analyst: free account, 1 question a day.

HawthornQuindaroBPU Solar FarmNortheast (MO)5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
540 MWNameplate
Generators
9 operatingEIA-860M, August 2026
Operating since
May 1972First generator online
Operator
Evergy MetroEIA operator ID 10000
Grid
SPPBalancing authority SWPP
Price nodes
8 SPP nodesResource nodes with prices
Location
Jackson County, MO39.1228, −94.5606
EIA plant ID
2081EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Northeast (MO) produces

Free · EIA-923

Net generation, 2025

14.7 GWh

14,738 MWh, final

Capacity factor, 2025

0.3%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.1–27.2

GWh a year. Low 2017, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000105,016Not reported12 of 12
200142,326Not reported12 of 12
200213,962Not reported12 of 12
20033,770Not reported9 of 12
2004−2,129Not reported12 of 12
20057,038Not reported12 of 12
2006−1,334Not reported6 of 12
20072,263Not reported12 of 12
2008−644Not reported12 of 12
2009−930Not reported12 of 12
2010−1,223-0.0%12 of 12
2011−1,423-0.0%12 of 12
2012−1,756-0.0%12 of 12
2013−568-0.0%12 of 12
20141,0550.0%12 of 12
20158620.0%12 of 12
20161,3170.0%12 of 12
2017−107-0.0%12 of 12
20181,584Not reported12 of 12
20192,5400.1%12 of 12
20206,3750.1%12 of 12
202122,1300.5%12 of 12
202212,9380.3%12 of 12
202325,537Not reported12 of 12
202427,2190.6%12 of 12
202514,7380.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

5

US short tons

NOx, 2025

189

US short tons

0 of 8 EPA units reported CO₂ in 2025 (11, 12, 13, 14, 15, 16, 17, 18), matched to EIA plant 2081 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
11Petroleum Liquids55.4May 1972
12Petroleum Liquids55.4May 1972
13Petroleum Liquids71.2May 1975
14Petroleum Liquids71.2May 1975
15Petroleum Liquids71.2June 1976
16Petroleum Liquids71.2June 1976
17Petroleum Liquids71.2May 1977
18Petroleum Liquids71.2May 1977
19Petroleum Liquids2.0June 1985

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Evergy Metro as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Northeast (MO) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Northeast (MO)

More plants operated by Evergy Metro

Questions about Northeast (MO)

How much power does Northeast (MO) produce?

Northeast (MO) reported 14,738 MWh (14.7 GWh) of net generation in 2025, a 0.3% capacity factor on 540 MW of nameplate capacity.

Where is Northeast (MO)?

Northeast (MO) is in Jackson County, Missouri, at 39.1228, −94.5606. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Northeast (MO)?

EIA-860M for August 2026 lists Evergy Metro as the operator (EIA operator ID 10000). The operator is not always the owner.

When did Northeast (MO) start operating?

Its first generator began operating in May 1972, according to EIA-860M.

Does InfraMap have power prices for Northeast (MO)?

Yes. InfraMap has SPP day-ahead and real-time prices at 8 price nodes linked to Northeast (MO), with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page