OilNatural gasOperatingBANC

McClure

Oil and natural gas power plant in Stanislaus County, California. 142.4 MW of nameplate capacity across 2 generators, operated by Modesto Irrigation District.

Also known as EIA plant 151

Analyst: free account, 1 question a day.

Almond Power PlantWoodlandERock MID Claribel Generation StationAxium Modesto SolarWalnutMcClure10 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
142.4 MWOil 71.2 · Natural gas 71.2
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1980First generator online
Operator
Modesto Irrigation DistrictEIA operator ID 12745
Grid
BANCBalancing authority BANC
Price nodes
None linkedNo verified ISO node
Location
Stanislaus County, CA37.6294, −120.9314
EIA plant ID
151EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McClure produces

Free · EIA-923

Net generation, 2025

1.56 GWh

1,556 MWh, final

Capacity factor, 2025

0.1%

2024: 0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.3–4.3

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200048,821Not reported12 of 12
200125,075Not reported12 of 12
200222,158Not reported12 of 12
200315,693Not reported10 of 12
20044,259Not reported12 of 12
200517,316Not reported12 of 12
200620,358Not reported12 of 12
20079,779Not reported12 of 12
200818,394Not reported12 of 12
20096,349Not reported12 of 12
20104,5850.4%12 of 12
20113,2400.3%12 of 12
20123,8950.3%12 of 12
20133,0460.2%12 of 12
20143,400Not reported12 of 12
20153,6170.3%12 of 12
20162,8530.2%12 of 12
20174,2770.3%12 of 12
20182,9580.2%12 of 12
20192,6590.2%12 of 12
20201,8330.1%12 of 12
20212,4470.2%12 of 12
20222,0970.2%12 of 12
20231,2540.1%12 of 12
20242,7020.2%12 of 12
20251,5560.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids71.2July 1980
2Natural Gas Fired Combustion Turbine71.2July 1981

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Modesto Irrigation District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McClure and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McClure

More plants operated by Modesto Irrigation District

Questions about McClure

How much power does McClure produce?

McClure reported 1,556 MWh (1.56 GWh) of net generation in 2025, a 0.1% capacity factor on 142.4 MW of nameplate capacity.

Where is McClure?

McClure is in Stanislaus County, California, at 37.6294, −120.9314. It is in the Balancing Authority of Northern California balancing area (BANC).

Who operates McClure?

EIA-860M for August 2026 lists Modesto Irrigation District as the operator (EIA operator ID 12745). The operator is not always the owner.

Is McClure a oil or a natural gas plant?

Both. Oil capacity totals 71.2 MW and natural gas capacity totals 71.2 MW.

When did McClure start operating?

Its first generator began operating in July 1980, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page