Natural gasOperatingISO-NE

Potter Station 2

Natural gas power plant in Norfolk County, Massachusetts. 116 MW of nameplate capacity across 2 generators, operated by Town of Braintree - (MA).

Also known as EIA plant 1660

Analyst: free account, 1 question a day.

Braintree Landfill SolarStation 9 Energy Storage SystemBoston Scientific SolarDorchester Solar SiteUMass BostonPotter Station 25 km
Open in the map
6 plants within 10 km, from EIA coordinates.

Key facts

Capacity
116 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2009First generator online
Operator
Town of Braintree - (MA)EIA operator ID 2144
Grid
ISO-NEBalancing authority ISNE
Price nodes
2 ISONE nodesResource nodes with prices
Location
Norfolk County, MA42.2350, −70.9672
EIA plant ID
1660EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Potter Station 2 produces

Free · EIA-923

Net generation, 2025

41.0 GWh

40,994 MWh, final

Capacity factor, 2025

4.0%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

14.9–58.9

GWh a year. Low 2019, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000120,903Not reported12 of 12
2001109,467Not reported12 of 12
200278,169Not reported12 of 12
2003Not reportedNot reported0 of 12
200446,654Not reported12 of 12
200518,347Not reported12 of 12
200613,711Not reported12 of 12
200710,822Not reported12 of 12
2008Not reportedNot reported0 of 12
20092,069Not reported6 of 12
20103,1700.7%3 of 12
201157,1683.0%12 of 12
20127,3214.5%1 of 12
201312,852Not reported2 of 12
201436,1103.7%6 of 12
201535,4012.0%11 of 12
201658,8813.1%12 of 12
201744,9782.4%12 of 12
201846,7842.5%12 of 12
201914,9280.8%12 of 12
202020,7361.1%12 of 12
202122,8131.2%12 of 12
202234,7671.8%12 of 12
202332,2741.7%12 of 12
202423,330Not reported12 of 12
202540,9944.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

27,186

US short tons. 2024: Not reported

SO₂, 2025

0

US short tons

NOx, 2025

3

US short tons

CO₂ per MWh, calculated

0.66 t

About 1,326 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (3, 4, 5), matched to EIA plant 1660 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WAT1Natural Gas Fired Combustion Turbine58.0July 2009
WAT2Natural Gas Fired Combustion Turbine58.0July 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Town of Braintree - (MA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Potter Station 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Potter Station 2

More plants operated by Town of Braintree - (MA)

Questions about Potter Station 2

How much power does Potter Station 2 produce?

Potter Station 2 reported 40,994 MWh (41.0 GWh) of net generation in 2025, a 4.0% capacity factor on 116 MW of nameplate capacity.

Where is Potter Station 2?

Potter Station 2 is in Norfolk County, Massachusetts, at 42.2350, −70.9672. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Potter Station 2?

EIA-860M for August 2026 lists Town of Braintree - (MA) as the operator (EIA operator ID 2144). The operator is not always the owner.

When did Potter Station 2 start operating?

Its first generator began operating in July 2009, according to EIA-860M.

Does InfraMap have power prices for Potter Station 2?

Yes. InfraMap has ISONE day-ahead and real-time prices at 2 price nodes linked to Potter Station 2, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page