Cleary Flood Hybrid
Natural gas project in Bristol County, Massachusetts. 121 MW of nameplate capacity across 3 generators, operated by City of Taunton - (MA).
Also known as Cleary Flood Hybrid Power Plant · EIA plant 1682
This project groups Cleary Flood Hybrid (EIA 1682). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 121 MWNatural gas 118.0 · Battery storage 3.0
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- December 1975First generator online
- Operator
- City of Taunton - (MA)EIA operator ID 18488
- Grid
- ISO-NEBalancing authority ISNE
- Price nodes
- 1 ISONE nodeResource nodes with prices
- Location
- Bristol County, MA41.8653, −71.1061
- EIA plant ID
- 1682EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Cleary Flood Hybrid produces
Free · EIA-923Net generation, 2025
54.2 GWh
54,191 MWh, final
Capacity factor, 2025
5.3%
2024: 12.8%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
9.5–168.2
GWh a year. Low 2021, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 250,969 | Not reported | 12 of 12 |
| 2001 | 177,982 | Not reported | 12 of 12 |
| 2002 | 184,512 | Not reported | 12 of 12 |
| 2003 | 113,234 | Not reported | 12 of 12 |
| 2004 | 57,346 | Not reported | 12 of 12 |
| 2005 | 52,927 | Not reported | 12 of 12 |
| 2006 | 15,587 | Not reported | 12 of 12 |
| 2007 | 27,594 | Not reported | 12 of 12 |
| 2008 | 10,734 | Not reported | 4 of 12 |
| 2009 | 30,302 | Not reported | 12 of 12 |
| 2010 | 86,660 | 6.8% | 12 of 12 |
| 2011 | 57,302 | Not reported | 12 of 12 |
| 2012 | 83,808 | 6.5% | 12 of 12 |
| 2013 | 80,403 | Not reported | 12 of 12 |
| 2014 | 101,339 | 11.8% | 8 of 12 |
| 2015 | 168,175 | 13.1% | 12 of 12 |
| 2016 | 31,622 | Not reported | 5 of 12 |
| 2017 | 57,677 | 4.5% | 12 of 12 |
| 2018 | 76,897 | 6.0% | 12 of 12 |
| 2019 | 33,589 | 2.6% | 12 of 12 |
| 2020 | 47,497 | Not reported | 10 of 12 |
| 2021 | 9,514 | 0.9% | 12 of 12 |
| 2022 | 24,496 | 2.4% | 12 of 12 |
| 2023 | 49,616 | 4.8% | 12 of 12 |
| 2024 | 132,522 | 12.8% | 12 of 12 |
| 2025 | 54,191 | 5.3% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ISONEEmissions
Free · EPA CAMPDCO₂, 2025
36,176
US short tons. 2024: 86,050
SO₂, 2025
0
US short tons
NOx, 2025
52
US short tons
CO₂ per MWh, calculated
0.67 t
About 1,335 lb per MWh
1 of 1 EPA units reported CO₂ in 2025 (8, 9), matched to EIA plant 1682 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
52
million gallons
Consumption, 2024
35
million gallons
Source
Taunton River
Surface, Brackish. Induced-draft tower
Watershed stress
Very low/none · 0.150
USGS SUI, HUC12 Taunton River-Frontal Mount Hope Bay
12 of 12 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 9A | Natural Gas Fired Combined Cycle | 23.0 | October 1976 |
| BS1 | Batteries | 3.0 | March 2020 |
| CA9 | Natural Gas Fired Combined Cycle | 95.0 | December 1975 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Taunton - (MA) as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Cleary Flood Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Cleary Flood Hybrid
More plants operated by City of Taunton - (MA)
Questions about Cleary Flood Hybrid
How much power does Cleary Flood Hybrid produce?
Cleary Flood Hybrid reported 54,191 MWh (54.2 GWh) of net generation in 2025, a 5.3% capacity factor on 121 MW of nameplate capacity.
Where is Cleary Flood Hybrid?
Cleary Flood Hybrid is in Bristol County, Massachusetts, at 41.8653, −71.1061. It is in the ISO New England Inc. balancing area (ISNE).
Who operates Cleary Flood Hybrid?
EIA-860M for August 2026 lists City of Taunton - (MA) as the operator (EIA operator ID 18488). The operator is not always the owner.
When did Cleary Flood Hybrid start operating?
Its first generator began operating in December 1975, according to EIA-860M.
Does InfraMap have power prices for Cleary Flood Hybrid?
Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Cleary Flood Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page