Edison Sault
Hydro power plant in Chippewa County, Michigan. 41.8 MW of nameplate capacity across 73 generators, operated by Cloverland Electric Co-op.
Also known as Cloverland Hydroelectric Plant · Cloverland Electric Cooperative Hydroelectric Plant · Saint Marys Falls Hydropower Plant · EIA plant 1751
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 41.8 MWNameplate
- Generators
- 73 operatingEIA-860M, August 2026
- Operating since
- July 1901First generator online
- Operator
- Cloverland Electric Co-opEIA operator ID 3828
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Chippewa County, MI46.4974, −84.3320
- EIA plant ID
- 1751EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Edison Sault produces
Free · EIA-923Net generation, 2025
181 GWh
180,785 MWh, final
Capacity factor, 2025
49.4%
2024: 54.2%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
180.8–233.6
GWh a year. Low 2025, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 0 | Not reported | 12 of 12 |
| 2001 | 173,992 | Not reported | 12 of 12 |
| 2002 | 215,390 | Not reported | 12 of 12 |
| 2003 | 189,237 | Not reported | 12 of 12 |
| 2004 | 201,505 | Not reported | 12 of 12 |
| 2005 | 211,569 | Not reported | 12 of 12 |
| 2006 | 156,299 | Not reported | 12 of 12 |
| 2007 | 101,516 | Not reported | 12 of 12 |
| 2008 | 162,307 | Not reported | 12 of 12 |
| 2009 | 144,910 | Not reported | 12 of 12 |
| 2010 | 117,959 | 32.2% | 12 of 12 |
| 2011 | 121,445 | 33.2% | 12 of 12 |
| 2012 | 131,087 | 35.7% | 12 of 12 |
| 2013 | 182,646 | 49.9% | 12 of 12 |
| 2014 | 220,031 | 60.1% | 12 of 12 |
| 2015 | 200,279 | 54.7% | 12 of 12 |
| 2016 | 213,794 | 58.2% | 12 of 12 |
| 2017 | 214,574 | 58.6% | 12 of 12 |
| 2018 | 212,928 | 58.2% | 12 of 12 |
| 2019 | 226,763 | 61.9% | 12 of 12 |
| 2020 | 223,442 | 60.9% | 12 of 12 |
| 2021 | 204,225 | 55.8% | 12 of 12 |
| 2022 | 205,922 | 56.2% | 12 of 12 |
| 2023 | 233,648 | 63.8% | 12 of 12 |
| 2024 | 199,042 | 54.2% | 12 of 12 |
| 2025 | 180,785 | 49.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 6 | Conventional Hydroelectric | 0.6 | July 1963 |
| 7 | Conventional Hydroelectric | 0.6 | July 1963 |
| 8 | Conventional Hydroelectric | 0.6 | July 1963 |
| 9 | Conventional Hydroelectric | 0.6 | July 1963 |
| 10 | Conventional Hydroelectric | 0.6 | July 1963 |
| 11 | Conventional Hydroelectric | 0.6 | July 1963 |
| 12 | Conventional Hydroelectric | 0.6 | July 1963 |
| 13 | Conventional Hydroelectric | 0.6 | July 1963 |
| 14 | Conventional Hydroelectric | 0.6 | July 1963 |
| 15 | Conventional Hydroelectric | 0.6 | July 1963 |
| 16 | Conventional Hydroelectric | 0.6 | July 1963 |
| 17 | Conventional Hydroelectric | 0.6 | July 1963 |
| 18 | Conventional Hydroelectric | 0.6 | July 1963 |
| 19 | Conventional Hydroelectric | 0.6 | July 1963 |
| 20 | Conventional Hydroelectric | 0.6 | July 1963 |
| 21 | Conventional Hydroelectric | 0.6 | July 1963 |
| 22 | Conventional Hydroelectric | 0.6 | July 1963 |
| 23 | Conventional Hydroelectric | 0.6 | July 1963 |
| 24 | Conventional Hydroelectric | 0.6 | July 1963 |
| 25 | Conventional Hydroelectric | 0.6 | July 1963 |
| 26 | Conventional Hydroelectric | 0.6 | July 1963 |
| 27 | Conventional Hydroelectric | 0.6 | July 1963 |
| 28 | Conventional Hydroelectric | 0.6 | July 1963 |
| 29 | Conventional Hydroelectric | 0.6 | July 1963 |
| 30 | Conventional Hydroelectric | 0.6 | July 1963 |
| 31 | Conventional Hydroelectric | 0.6 | July 1963 |
| 32 | Conventional Hydroelectric | 0.6 | July 1963 |
| 33 | Conventional Hydroelectric | 0.6 | July 1963 |
| 34 | Conventional Hydroelectric | 0.6 | July 1963 |
| 35 | Conventional Hydroelectric | 0.6 | July 1963 |
| 36 | Conventional Hydroelectric | 0.6 | July 1963 |
| 37 | Conventional Hydroelectric | 0.6 | July 1963 |
| 38 | Conventional Hydroelectric | 0.6 | July 1963 |
| 39 | Conventional Hydroelectric | 0.6 | July 1963 |
| 40 | Conventional Hydroelectric | 0.6 | July 1963 |
| 41 | Conventional Hydroelectric | 0.6 | July 1901 |
| 42 | Conventional Hydroelectric | 0.5 | July 1901 |
| 45 | Conventional Hydroelectric | 0.6 | July 1916 |
| 46 | Conventional Hydroelectric | 0.6 | July 1963 |
| 47 | Conventional Hydroelectric | 0.6 | July 1963 |
Showing 40 of 73 generators. The map lists all of them.
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cloverland Electric Co-op as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Edison Sault and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Edison Sault
More plants operated by Cloverland Electric Co-op
Questions about Edison Sault
How much power does Edison Sault produce?
Edison Sault reported 180,785 MWh (181 GWh) of net generation in 2025, a 49.4% capacity factor on 41.8 MW of nameplate capacity.
Where is Edison Sault?
Edison Sault is in Chippewa County, Michigan, at 46.4974, −84.3320. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Edison Sault?
EIA-860M for August 2026 lists Cloverland Electric Co-op as the operator (EIA operator ID 3828). The operator is not always the owner.
When did Edison Sault start operating?
Its first generator began operating in July 1901, according to EIA-860M.
Does InfraMap have power prices for Edison Sault?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Edison Sault, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page