HydroOperatingMISO

Kingsford

Hydro power plant in Dickinson County, Michigan. 7.2 MW of nameplate capacity across 3 generators, operated by Wisconsin Electric Power Co.

Also known as EIA plant 1778

Analyst: free account, 1 question a day.

Big Quinnesec 61Big Quinnesec 92Twin Falls (WI)PineLittle Quinnesec Falls Hydro ProjectKingsford5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
7.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 1924First generator online
Operator
Wisconsin Electric Power CoEIA operator ID 20847
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Dickinson County, MI45.8080, −88.1251
EIA plant ID
1778EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Kingsford produces

Free · EIA-923

Net generation, 2025

25.7 GWh

25,683 MWh, final

Capacity factor, 2025

40.7%

2024: 39.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

24.8–36.4

GWh a year. Low 2024, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200026,275Not reported12 of 12
200127,011Not reported12 of 12
200232,605Not reported12 of 12
200326,394Not reported12 of 12
200427,842Not reported12 of 12
200525,254Not reported12 of 12
200625,078Not reported12 of 12
200721,211Not reported12 of 12
200821,798Not reported12 of 12
200919,318Not reported12 of 12
201023,65230.0%12 of 12
201124,75731.4%12 of 12
201219,399Not reported12 of 12
201323,93938.0%12 of 12
201429,11546.2%12 of 12
201529,08146.1%12 of 12
201631,09349.2%12 of 12
201736,35657.6%12 of 12
201828,65245.4%12 of 12
201926,67242.3%12 of 12
202027,05942.8%12 of 12
202125,10239.8%12 of 12
202229,76247.2%12 of 12
202325,18039.9%12 of 12
202424,76639.2%12 of 12
202525,68340.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric2.4May 1924
2Conventional Hydroelectric2.4May 1924
3Conventional Hydroelectric2.4May 1924

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wisconsin Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Kingsford and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Kingsford

More plants operated by Wisconsin Electric Power Co

Questions about Kingsford

How much power does Kingsford produce?

Kingsford reported 25,683 MWh (25.7 GWh) of net generation in 2025, a 40.7% capacity factor on 7.2 MW of nameplate capacity.

Where is Kingsford?

Kingsford is in Dickinson County, Michigan, at 45.8080, −88.1251. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Kingsford?

EIA-860M for August 2026 lists Wisconsin Electric Power Co as the operator (EIA operator ID 20847). The operator is not always the owner.

When did Kingsford start operating?

Its first generator began operating in May 1924, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page