HydroOperatingMISO

Big Quinnesec 92

Hydro power plant in Dickinson County, Michigan. 16 MW of nameplate capacity across 2 generators, operated by Wisconsin Electric Power Co.

Also known as EIA plant 7820

Analyst: free account, 1 question a day.

Little Quinnesec Falls Hydro ProjectKingsfordTwin Falls (WI)Big Quinnesec 925 km
Open in the map
5 plants within 9.7 km, from EIA coordinates.

Key facts

Capacity
16 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 1949First generator online
Operator
Wisconsin Electric Power CoEIA operator ID 20847
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Dickinson County, MI45.7881, −88.0408
EIA plant ID
7820EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Big Quinnesec 92 produces

Free · EIA-923

Net generation, 2025

100 GWh

100,031 MWh, final

Capacity factor, 2025

71.4%

2024: 63.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

89.1–136.6

GWh a year. Low 2024, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200091,241Not reported12 of 12
200195,417Not reported12 of 12
2002114,056Not reported12 of 12
200393,870Not reported12 of 12
200497,899Not reported12 of 12
200593,341Not reported12 of 12
200689,869Not reported12 of 12
200776,082Not reported12 of 12
200878,654Not reported12 of 12
200966,873Not reported12 of 12
201086,58955.5%12 of 12
201188,60556.8%12 of 12
201265,892Not reported12 of 12
201373,32352.3%12 of 12
2014104,83174.8%12 of 12
2015106,20775.8%12 of 12
2016113,51780.8%12 of 12
2017126,80090.5%12 of 12
2018117,57283.9%12 of 12
2019113,87481.2%12 of 12
2020136,61197.2%12 of 12
2021104,67774.7%12 of 12
2022104,99774.9%12 of 12
202399,55171.0%12 of 12
202489,11163.4%12 of 12
2025100,03171.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric8.0November 1949
2Conventional Hydroelectric8.0December 1949

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wisconsin Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Big Quinnesec 92 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Big Quinnesec 92

More plants operated by Wisconsin Electric Power Co

Questions about Big Quinnesec 92

How much power does Big Quinnesec 92 produce?

Big Quinnesec 92 reported 100,031 MWh (100 GWh) of net generation in 2025, a 71.4% capacity factor on 16 MW of nameplate capacity.

Where is Big Quinnesec 92?

Big Quinnesec 92 is in Dickinson County, Michigan, at 45.7881, −88.0408. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Big Quinnesec 92?

EIA-860M for August 2026 lists Wisconsin Electric Power Co as the operator (EIA operator ID 20847). The operator is not always the owner.

When did Big Quinnesec 92 start operating?

Its first generator began operating in November 1949, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page