Cambridge CT Hybrid
Natural gas power plant in Isanti County, Minnesota. 194.3 MW of nameplate capacity across 2 generators, operated by Great River Energy.
Also known as Cambridge CT Power Plant · EIA plant 2038
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 194.3 MWNatural gas 169.2 · Oil 25.1
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- May 1978First generator online
- Operator
- Great River EnergyEIA operator ID 7570
- Grid
- MISOBalancing authority MISO
- Price nodes
- 2 MISO nodesResource nodes with prices
- Location
- Isanti County, MN45.6010, −93.2081
- EIA plant ID
- 2038EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Cambridge CT Hybrid produces
Free · EIA-923Net generation, 2025
101 GWh
100,721 MWh, final
Capacity factor, 2025
5.9%
2024: 2.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
0.7–100.7
GWh a year. Low 2019, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 1,921 | Not reported | 12 of 12 |
| 2001 | 410 | Not reported | 12 of 12 |
| 2002 | 347 | Not reported | 12 of 12 |
| 2003 | 355 | Not reported | 12 of 12 |
| 2004 | 0 | Not reported | 12 of 12 |
| 2005 | 312 | Not reported | 12 of 12 |
| 2006 | 150 | Not reported | 12 of 12 |
| 2007 | 82 | Not reported | 12 of 12 |
| 2008 | 70,273 | Not reported | 12 of 12 |
| 2009 | 38,009 | Not reported | 12 of 12 |
| 2010 | 29,782 | 1.5% | 12 of 12 |
| 2011 | 50,768 | Not reported | 12 of 12 |
| 2012 | 90,169 | 5.3% | 12 of 12 |
| 2013 | 83,051 | 4.9% | 12 of 12 |
| 2014 | 32,339 | 1.9% | 12 of 12 |
| 2015 | 33,011 | 1.9% | 12 of 12 |
| 2016 | 44,337 | 2.6% | 12 of 12 |
| 2017 | 22,024 | 1.3% | 12 of 12 |
| 2018 | 56,197 | 3.3% | 12 of 12 |
| 2019 | 659 | 0.0% | 12 of 12 |
| 2020 | 20,378 | 1.2% | 12 of 12 |
| 2021 | 95,839 | Not reported | 12 of 12 |
| 2022 | 31,693 | 1.9% | 12 of 12 |
| 2023 | 49,430 | 2.9% | 12 of 12 |
| 2024 | 35,714 | 2.1% | 12 of 12 |
| 2025 | 100,721 | 5.9% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDCO₂, 2025
Not reported
US short tons. 2024: Not reported
SO₂, 2025
0
US short tons
NOx, 2025
50
US short tons
1 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 2038 through the EPA–EIA crosswalk.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GT1 | Petroleum Liquids | 25.1 | May 1978 |
| GT2 | Natural Gas Fired Combustion Turbine | 169.2 | May 2007 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Great River Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Cambridge CT Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Cambridge CT Hybrid
More plants operated by Great River Energy
Questions about Cambridge CT Hybrid
How much power does Cambridge CT Hybrid produce?
Cambridge CT Hybrid reported 100,721 MWh (101 GWh) of net generation in 2025, a 5.9% capacity factor on 194.3 MW of nameplate capacity.
Where is Cambridge CT Hybrid?
Cambridge CT Hybrid is in Isanti County, Minnesota, at 45.6010, −93.2081. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Cambridge CT Hybrid?
EIA-860M for August 2026 lists Great River Energy as the operator (EIA operator ID 7570). The operator is not always the owner.
When did Cambridge CT Hybrid start operating?
Its first generator began operating in May 1978, according to EIA-860M.
Does InfraMap have power prices for Cambridge CT Hybrid?
Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Cambridge CT Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page