Natural gasOperatingPJM

Gilbert

Natural gas power plant in Hunterdon County, New Jersey. 512 MW of nameplate capacity across 6 generators, operated by Gilbert Power, LLC.

Also known as Gilbert Generating Station · EIA plant 2393

Analyst: free account, 1 question a day.

Milford Solar Farm (NJ) LLCHolland Solar FarmHolland SolarStryker 22, L.L.C.Pohatcong Solar FarmFrenchtown I SolarGilbert5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
512 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
January 1974First generator online
Operator
Gilbert Power, LLCEIA operator ID 63033
Grid
PJMBalancing authority PJM
Price nodes
6 PJM nodesResource nodes with prices
Location
Hunterdon County, NJ40.5658, −75.1639
EIA plant ID
2393EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gilbert produces

Free · EIA-923

Net generation, 2025

88.3 GWh

88,321 MWh, final

Capacity factor, 2025

2.0%

2024: 1.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.1–94.6

GWh a year. Low 2018, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000236,458Not reported12 of 12
2001181,986Not reported12 of 12
2002289,471Not reported12 of 12
2003242,516Not reported9 of 12
200474,044Not reported12 of 12
2005145,717Not reported11 of 12
200660,782Not reported12 of 12
200736,894Not reported12 of 12
200830,634Not reported7 of 12
20095,439Not reported12 of 12
201013,0190.4%7 of 12
201122,1420.4%12 of 12
201242,4680.8%12 of 12
201320,202Not reported12 of 12
201466,3191.2%12 of 12
201534,800Not reported12 of 12
201655,4541.2%12 of 12
20178,5330.2%12 of 12
20181,063Not reported12 of 12
20194,1960.1%12 of 12
202012,670Not reported12 of 12
202168,8041.5%12 of 12
202294,6152.1%12 of 12
202326,7940.6%12 of 12
202454,7501.2%12 of 12
202588,3212.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

66,423

US short tons. 2024: 43,237

SO₂, 2025

0

US short tons

NOx, 2025

26

US short tons

CO₂ per MWh, calculated

0.75 t

About 1,504 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (15001, 16001, 17001, 18001, 4, 5, 6, 7, and others), matched to EIA plant 2393 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

14

million gallons

Consumption, 2024

6

million gallons

Source

Delaware River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.121

USGS SUI, HUC12 Harihokake Creek-Delaware River

7 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Natural Gas Fired Combined Cycle54.0January 1974
5Natural Gas Fired Combined Cycle54.0April 1974
6Natural Gas Fired Combined Cycle54.0April 1974
7Natural Gas Fired Combined Cycle54.0May 1974
8Natural Gas Fired Combined Cycle135.0May 1977
9Natural Gas Fired Combustion Turbine161.0July 1996

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Gilbert Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gilbert and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gilbert

Questions about Gilbert

How much power does Gilbert produce?

Gilbert reported 88,321 MWh (88.3 GWh) of net generation in 2025, a 2.0% capacity factor on 512 MW of nameplate capacity.

Where is Gilbert?

Gilbert is in Hunterdon County, New Jersey, at 40.5658, −75.1639. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Gilbert?

EIA-860M for August 2026 lists Gilbert Power, LLC as the operator (EIA operator ID 63033). The operator is not always the owner.

When did Gilbert start operating?

Its first generator began operating in January 1974, according to EIA-860M.

Does InfraMap have power prices for Gilbert?

Yes. InfraMap has PJM day-ahead and real-time prices at 6 price nodes linked to Gilbert, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page